Rapid Reclamation and Treatment Method of Coal Gangue Dump in Semi-arid Sandstorm Area
A coal gangue and semi-arid technology, applied in the field of rapid reclamation and management of coal gangue hills in semi-arid sandstorm areas, can solve problems such as narrow application range, high cost, and slow speed, and achieve economical and practical effects with long-lasting benefits
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
specific Embodiment approach
[0015] The method for fast reclamation and management of coal gangue hills in semi-arid sandstorm area of the present invention, its preferred specific implementation mode is:
[0016] Include the following steps in order:
[0017] Reshaping and transformation; pad soil covering with sand; setting up rain-collecting bed surface; erecting sand barrier; using grass to promote irrigation and cultivation or combination of shrub and grass and cultivation; reclamation management and prevention of coal gangue re-ignition.
[0018] The plastic modification includes:
[0019] The gangue pile platform is compacted, leveled, slope cut and load reduced, and a slope of 1:1.5 is formed around the platform.
[0020] The described pad soil covering sand includes:
[0021] 50cm of sand shall be covered after 15cm of cushion soil on the countertop and side slope of the gangue platform.
[0022] Said setting rain collecting bed surface includes:
[0023] The table top of the platform cover...
specific Embodiment
[0034] Specific examples, such as figure 1 , figure 2 , image 3 Shown:
[0035] Include the following steps in order:
[0036] (1) plastic transformation;
[0037] (2) Cushion soil covered with sand;
[0038] (3) Set the rain collecting bed surface;
[0039] (4) Set up sand barriers;
[0040] (5) Using grass to promote irrigation, combining shrub and grass and cultivating;
[0041] (5) Reclamation management to prevent re-ignition of coal gangue;
[0042] The above-mentioned coal gangue hill plastic transformation, its method is to comprehensively prepare the platform and side slope of the gangue hill, level it and take a solid shot, and cut the side slope to form a side slope of 1:1.5, so as to achieve the purpose of stabilizing the side slope .
[0043] The step of covering sand with pad soil is to cover 50 cm of sand with 15 cm of pad soil on gangue hill slope and platform base, so as to achieve the effect of improving substrate and promoting growth with water ad...