Vertical in-tunnel construction method of multilayer transverse channel of underground excavation station of metro, and construction method on east side and west side

A technology of lateral passage and construction method, applied in tunnels, earthwork drilling, shaft equipment, etc., can solve the problems of high safety risk, high material input, slow speed, etc., and achieve the effect of reducing risks, reducing settlement, and avoiding risky operations.

Active Publication Date: 2013-12-18
CHINA RAILWAY NO 2 ENG GRP CO LTD +2
View PDF6 Cites 21 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0007] With the development of urban rail transit, underground excavation stations are gradually increasing, and the above-mentioned multi-layer horizontal passage Matoumen entry hole construction method still has shortcomings such as slow speed, high safety risk, and large material input.

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Vertical in-tunnel construction method of multilayer transverse channel of underground excavation station of metro, and construction method on east side and west side
  • Vertical in-tunnel construction method of multilayer transverse channel of underground excavation station of metro, and construction method on east side and west side
  • Vertical in-tunnel construction method of multilayer transverse channel of underground excavation station of metro, and construction method on east side and west side

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0058] The present invention will be further described in detail below in conjunction with test examples and specific embodiments. However, it should not be understood that the scope of the above subject matter of the present invention is limited to the following embodiments, and all technologies realized based on the content of the present invention belong to the scope of the present invention.

[0059] Such as Figure 1 to Figure 20 As shown, the present embodiment is a method for vertically entering a hole in a multi-layer horizontal channel of a subway underground excavation station, comprising the following steps:

[0060] a. Excavate vertical shaft 1 to below the bottom level of horizontal channel 2a on the first floor, and temporarily seal the bottom of vertical shaft 1 by section steel and C20 sprayed concrete. For details, please refer to figure 2 ;

[0061] b. Set up the working platform, carry out measurement and setting out, release the horse head gate excavatio...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention discloses a vertical in-tunnel construction method of a multilayer transverse channel of an underground excavation station of a metro. The vertical in-tunnel construction method comprises the following steps: a, excavating a silo till below a bottom elevation of the transverse channel at the first floor, and temporarily sealing the bottom of the silo through section steel and C20 net spraying concrete; and b, setting up a working platform to carry out surveying and lining, and releasing a horsehead of the transverse channel at the first floor to excavate a contour line so as to complete construction of the transverse channel at the first floor. When the horsehead at the lower-layer transverse channel is destroyed, a ring is formed in the horsehead, so that deposition caused by break of the horsehead is reduced, that is to say, risk of breaking the horsehead is greatly reduced through a manner of forming the ring in the transverse channel and then breaking the horsehead.

Description

technical field [0001] The invention relates to a method for vertically entering a hole in a multi-layered cross passage of a subway underground excavation station. Background technique [0002] Subway underground excavation stations are buried shallowly under urban roads, and shafts need to be excavated under the ground to create a working face to organize construction. However, the location of the road does not meet the conditions for excavating shafts, so shafts must be excavated on the side of the subway station according to the conditions of the project. , and then excavate a horizontal passage from the vertical shaft to the station, and open up the working face into the subway station from the horizontal passage. [0003] The vertical shaft is generally located on both sides of the main structure of the station. The depth of the vertical shaft depends on the buried depth of the main structure of the station, and it is about 1.5 meters deeper than the horizontal channel...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
Patent Type & Authority Applications(China)
IPC IPC(8): E21D9/00E21D1/00E21D9/12
Inventor 李阳卿三惠赵瑞文王湘华毛明林耿开亮刘昌玉姜晓明李伟王清瞿国丽杨龙腾
Owner CHINA RAILWAY NO 2 ENG GRP CO LTD
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products