Mine roof and floor water inrush monitoring and prediction system and method
A forecasting system, roof and floor technology, applied in the field of coal mine safety, can solve the problems of decreased accuracy of monitoring results, single monitoring parameter basis, potential safety hazards, etc., and achieves the effects of fast collection speed, rich information, and error avoidance
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment
[0051] The mine roof and floor water inrush monitoring and forecasting system is placed in the coal mine excavation roadway, the background vibration signal intensity of the mine roof and floor received by the three-dimensional vibration sensor 1.2 is 10mv, and 10mv is set as the amplitude value of the roof and floor background vibration signal; when the three-dimensional vibration sensor 1.2 At a certain moment, a vibration signal is measured, the intensity of the vibration signal is 35mv, and the vibration frequency is 500HZ; at this time, because the intensity of the vibration signal is greater than three times the amplitude value of the background signal of the mine roof and floor, the host terminal 3 in the ground control room starts the underground The on-site host 2 controls the electrode 1.3 to measure the mine roof and floor by the excited polarization high-density electrical method; The apparent resistivity of the floor is 300Ω / m (the background value of the apparent ...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com