A technology for detecting wheels and rails, applied in the direction of coating, etc., can solve the problems of splashing liquid raw materials, complicated manufacturing process, high safety factor, etc., and achieve the effects of easy industrial manufacturing, improved safety factor, and simplified preparation process
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Examples
Embodiment 1
[0011] A method for preparing the outer film of a steel plate or rail detection wheel, the specific operation process is as follows:
[0012] Put polyurethane as raw material into the production equipment for injection molding: the first zone is 185 degrees Celsius, the second zone is 175 degrees Celsius, and the third zone is 165 degrees Celsius; the molding of the product goes through three injection processes: the pressure of the first level injection is 100 kg, speed 40m / s, time 9.0 seconds, the pressure after putting into the storage is 85 kg, speed 55m / s, injection length 30mm; the pressure of the second level injection is 85 kg, speed 45m / s, time 16 seconds, the pressure after putting in the storage material is 95 kg, the speed is 65m / s, and the injection length is 120mm; the pressure of the storage material during the third level injection is 80 kg, the speed is 45m / s, and the injection length is 123mm; after that, keep the pressure The process of the link: the pressur...
Embodiment 2
[0014] A method for preparing the outer film of a steel plate or rail detection wheel, the specific operation process is as follows:
[0015] Put polyurethane as raw material into the production equipment for injection molding: the first zone is 200 degrees Celsius, the second zone is 170 degrees Celsius, and the third zone is 160 degrees Celsius; the molding of the product goes through three injection processes: the pressure of the first level injection is 90 kg , The speed is 40m / s, the time is 10.0 seconds, the pressure after putting into the storage is 80 kg, the speed is 55m / s, and the injection length is 35mm; the pressure of the second level injection is 90 kg, the speed is 45m / s, and the time is 15 seconds , the pressure after putting in the storage material is 90 kg, the speed is 65m / s, and the injection length is 140mm; the pressure of the storage material in the third level injection is 90 kg, the speed is 45m / s, and the injection length is 123mm; after that, the pre...
Embodiment 3
[0017] A method for preparing the outer film of a steel plate or rail detection wheel, the specific operation process is as follows:
[0018] Put polyurethane as raw material into the production equipment for injection molding: the first zone is 190 degrees Celsius, the second zone is 180 degrees Celsius, and the third zone is 170 degrees Celsius; the molding of the product goes through three injection processes: the pressure of the first level injection is 95 kg, speed 40m / s, time 10.0 seconds, the pressure after putting into the storage is 90 kg, speed 55m / s, injection length 35mm; the pressure of the second level injection is 80 kg, speed 45m / s, time 15 second, the pressure after putting in the storage material is 100 kg, the speed is 65m / s, and the injection length is 140mm; the pressure of the storage material is 85 kg, the speed is 45m / s, and the injection length is 123mm during the third level of injection; after that, keep the pressure The process of the link: the pres...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com