Hydropower-station flood optimization dispatching method taking gate operation rules into consideration
A technology for optimizing scheduling and hydropower stations, applied in water conservancy projects, climate change adaptation, forecasting, etc., can solve problems such as deviation, reduce the work intensity and error probability of dispatchers
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0074] In order to make the technical means, creative features, goals and effects achieved by the present invention easy to understand, the present invention will be further described below in conjunction with specific embodiments.
[0075] see figure 1 , the flood optimization scheduling method of the present invention includes five steps: structural description of gate operation rules, instantiation of gate operation rules, optimization generation of gate opening combination number sequences, optimization adjustment of gate opening combination number sequences, and generation of gate operation plans.
[0076] Among them, the structured description of the gate operation rules adopts a structured description method to fully express complex information such as the allowable opening of the gate, the opening sequence and the combination of opening degrees, and provides a basis for the instantiation of the gate operation rules and the computer analysis of the gate operation rules. ...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com