Hydropower-station flood optimization dispatching method taking gate operation rules into consideration

A technology for optimizing scheduling and hydropower stations, applied in water conservancy projects, climate change adaptation, forecasting, etc., can solve problems such as deviation, reduce the work intensity and error probability of dispatchers

Active Publication Date: 2014-03-19
STATE GRID ELECTRIC POWER RES INST +2
View PDF4 Cites 22 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0017] Aiming at the deficiencies in the prior art, the purpose of the present invention is to provide a hydropower station flood optimization dispatching method that considers gate operation rules, which solves the problem of serious deviation between the actual execution link and the planning link of the traditional method, and improves the hydropower station’s optimal flood discharge flow process line. The actual guiding role of the dispatcher reduces the work intensity and error probability of the dispatcher, and at the same time, assists the dispatcher to more accurately study and judge the change of the flood control situation in the later period

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Hydropower-station flood optimization dispatching method taking gate operation rules into consideration
  • Hydropower-station flood optimization dispatching method taking gate operation rules into consideration
  • Hydropower-station flood optimization dispatching method taking gate operation rules into consideration

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0074] In order to make the technical means, creative features, goals and effects achieved by the present invention easy to understand, the present invention will be further described below in conjunction with specific embodiments.

[0075] see figure 1 , the flood optimization scheduling method of the present invention includes five steps: structural description of gate operation rules, instantiation of gate operation rules, optimization generation of gate opening combination number sequences, optimization adjustment of gate opening combination number sequences, and generation of gate operation plans.

[0076] Among them, the structured description of the gate operation rules adopts a structured description method to fully express complex information such as the allowable opening of the gate, the opening sequence and the combination of opening degrees, and provides a basis for the instantiation of the gate operation rules and the computer analysis of the gate operation rules. ...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention discloses a hydropower-station flood optimization dispatching method which takes gate operation rules into consideration. The method includes five steps: (1) structural description of the gate operation rules, which solves an expression problem of the complex gate operation rules; (2) instantiation of the gate operation rules, which solves a problem of how to use the structural-body examples of the gate operation rules to describe specific hydropower-station gate operation rules; (3) optimization generation of a gate opening combination number sequence, which solves a problem of coupling of the gate operation rules and traditional hydropower-station flood optimization dispatching methods; (4) optimization adjustment of the gate opening combination number sequence, which solves problems that in a flood dispatching process, during specific periods, water level exceeds the limit and at the end of a dispatching period, deviation exists between the water level and a target water level; (5) generation of a gate operation plan, which solves a problem of generating the gate operation plan dynamically according to the gate opening combination number sequence. The hydropower-station flood optimization dispatching method which takes the gate operation rules into consideration improves prediction accuracy of a later-period flood-discharge flow process and improves the rapid response capability of a flood prevention decision of a hydropower station.

Description

technical field [0001] The invention relates to a flood optimization dispatching method, in particular to a hydropower station flood optimization dispatching method considering gate operation rules. Background technique [0002] The traditional flood optimization dispatching method for hydropower stations regards all gates as a dispatching object, only considers the overall discharge capacity of all gates, and does not consider gate operating rules such as the allowable opening degree, opening sequence, and opening degree combination of each gate, and can only calculate The optimized total discharge flow process line of the hydropower gate group as a whole cannot automatically formulate the optimal operation plan for each gate. In the actual operation link, the dispatcher needs to manually formulate the operation plan of each gate according to the optimized total flood discharge flow process line. This method is difficult to meet the business needs of fine scheduling and re...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
Patent Type & Authority Applications(China)
IPC IPC(8): G06Q10/04G06Q50/06E02B7/22
CPCY02A10/40
Inventor 芮钧吴维宁刘观标刘果徐洁李泽宏李永红郑健兵王安东王俊莉
Owner STATE GRID ELECTRIC POWER RES INST
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products