Software project progress management method and system

A software project and progress management technology, applied in the field of software testing, can solve problems such as task delay, delay in execution, project delay, etc., and achieve the effect of improving work efficiency and being easy to use

Inactive Publication Date: 2014-04-23
北京亿起联科技有限公司
View PDF3 Cites 8 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

At present, there are still the following phenomena: First, most project leaders will promptly analyze the cause of the problem after discovering the problem, and come up with a solution to adjust the deployment accordingly. Therefore, the project test plan is also updated accordingly. The project leader, at the beginning of the project, often elaborate plans are often delayed in the implementation process; second, although the test plan can be updated, the problem of project delay will inevitably occur, and this problem has been not effectively resolved
One of the main reasons for the above problems is that the time control ability of each stage of the test is poor, which leads to the delay of the task, which makes the project postponed

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Software project progress management method and system
  • Software project progress management method and system

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0020] Below in conjunction with accompanying drawing and specific embodiment, further illustrate the present invention, should be understood that these embodiments are only for illustrating the present invention and are not intended to limit the scope of the present invention, after having read the present invention, those skilled in the art will understand various aspects of the present invention Modifications in equivalent forms all fall within the scope defined by the appended claims of this application.

[0021] Examples of software project schedule management methods figure 1 shown, including the following steps:

[0022] 1) Associate Microsoft Project files and identify each test phase in the Microsoft Project test plan. The test phase includes test preparation phase, requirements analysis and design phase, use case design phase, test execution phase, system maintenance and BUG phase, and test summary phase;

[0023] 2) Read the key points of "New" and "End of review" ...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The present invention discloses a software project progress management method and a system. The method comprises the following steps of identifying the test stages of a Microsoft Project test plan; reading the start key points and the end key points of the test stages respectively; reading the current date and time of a computer, automatically judging the current test stage of a software project and popping up a prompt dialog box; calculating the number of days from the current test stage of the software project to the end key point via a time function, and popping up the prompt dialog box once a day from the preset number of days before the end key point. The system comprises a correlation test module, a date reading module, a project identification module, a comparison module and a prompt module. According to the method, the progress of the software project is real-timely monitored, and the progress condition of the software project is outputted reasonably, so that users can grasp the progress of the software project more accurately, the system is simple and convenient to use, and the progress of the project can be prompted automatically.

Description

technical field [0001] The invention relates to a computer software project management method and system, in particular to a software project progress management method and system, belonging to the technical field of software testing. Background technique [0002] The current software testing process starts with a test plan and is implemented according to the plan. However, plans often fail to keep up with changes. With the progress of the project, various problems and factors interfered, making the progress of the test time, that is, the project progress deviate from the original design track, and develop in an uncontrollable direction. Moreover, the industry does not have methods and system tools for managing project progress. The two most widely used tools, commercial tools such as QC (Quality Center) and TC (test center), and open source tools such as BugFree, do not have the function of design progress management. At present, there are still the following phenomena: ...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
IPC IPC(8): G06Q10/06
Inventor 王新
Owner 北京亿起联科技有限公司