Pipe wall waterproof device and its construction technology, heat insulation pipe equipped with the waterproof device
A technology of waterproof device and construction technology, which is applied in the direction of pipeline protection, pipeline protection through heat insulation, pipes/pipe joints/pipe fittings, etc. It can solve the problems of poor waterproof effect, difficulty in meeting construction acceptance and use requirements, etc., and achieve long service life , Meet the construction acceptance and use requirements, good sealing effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0051] Such as Figure 1-2 As shown, it is a preferred embodiment of the pipeline wall-penetrating waterproof device and its construction process, and the heat-insulating pipe assembled with the waterproof device of the present invention. The pipeline wall-penetrating waterproof device includes a steel part main body 1, a sealing rubber ring 4, and a movable retaining ring 5 , waterproof rubber strip 8, support bracket 9 and some bolt blade assemblies.
[0052] Such as image 3 As shown, the steel part main body 1 is fixedly arranged in the inspection well wall 2, the steel part main body 1 includes a main body pipe 11 and at least two layers of steel rings 12, the inside of the main body pipe 11 is sleeved with a pipe 3, and The main pipe 11 protrudes from the wall 2 at least toward one end of the inspection well, and the main pipe 11 protrudes from the wall 2 toward the inspection well and along the main pipe 11 . 11 circumferentially distributed with some pin holes. An a...
Embodiment 2
[0068] In this embodiment, the waterproof device for pipeline penetration includes a steel body 1 , a sealing rubber ring 4 , a movable retaining ring 5 and several bolt blade assemblies. The specific structures of the steel body 1 , the sealing rubber ring 4 , the movable retaining ring 5 and several bolt blade assemblies are the same as those in the first embodiment.
[0069] The construction process of the pipeline wall penetrating waterproof device in this embodiment includes the following steps:
[0070] ① Fix the steel part main body 1 on the inspection well wall 2 and lay the pipeline 3, so that the end of the main body pipe 11 of the steel part main body 1 with a pin hole is placed in the inspection well indoor.
[0071] Specifically, in this step, the steel ring 12 of the steel body 1 is first welded to the steel bar of the wall 2, and then the manhole is poured, and the pipeline 3 is inserted into the main pipe. 11.
[0072] ② Set the sealing rubber ring 4 and the...