Real-time monitoring method of high-speed train bogie serpentine motion based on model and rules
A high-speed train, real-time monitoring technology, applied in the direction of railway vehicle testing, etc., can solve the problems of bogie fault diagnosis and bogie judgment
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0027] The following is a further description of the present invention according to the accompanying drawings.
[0028] The invention discloses a real-time monitoring method for the serpentine motion of a high-speed train bogie based on models and rules, which includes a high-precision sensor 2 and a control system 8 installed on the bogie 1 . The control system 8 is composed of an optical fiber input interface device 3, a signal filtering device 4, a signal conditioning device 5, a digital signal input and output device 6 and a central processing unit 7 (see figure 1 ).
[0029] The high-precision sensor 2 collects the acceleration signal of the lateral running of the bogie 1, and transmits the acceleration signal to the optical fiber input interface device 3 in the control system 8 through an optical fiber. The device 5 converts the collected analog signal into a digital signal, transmits the digital signal to the central processing unit 7 through the digital signal input ...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 