Barrier-free maintenance room for unloader of train with slot unloading trough
A technology of unloading machine and maintenance room, which is applied in the field of equipment maintenance room of train unloading system, can solve the problems of not having the unloading machine to lift off the unloading operation line, and it is difficult to achieve the effect, so as to reduce the quantity, save the investment cost and save the land resources. Effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0027] Barrier-free maintenance room is set up according to the maintenance double-seam type coal tank train unloader.
[0028] 1. Determine the span of the barrier-free maintenance room. The span of the barrier-free maintenance room cannot be smaller than the span of the superstructure of the slotted coal chute, and the span of the double-slotted coal chute is 15m. In order to save investment, the span of the barrier-free maintenance room is 15m.
[0029] 2. Calculate the span Lk of the bridge crane, Lk=15-(2×0.75)=13.5m. (Note: 15m is the span value of the barrier-free maintenance room, and 0.75m is the distance between the bridge crane track and the column center of the maintenance room).
[0030] 3. Determine the lifting weight of the main hook of the bridge crane, which should be greater than the total weight of the double-slot coal tank train unloader (about 32 tons), and select the lifting weight of the main hook as 35 tons.
[0031] 4. Determine the lifting weight of...