Transmission scheduling method and device
A technology for transmission scheduling and equipment, which is applied in the field of transmission scheduling methods and equipment, can solve problems such as inaccurate resource scheduling, inappropriate precoding matrix selection, resource scheduling, and influence of precoding matrix selection link adaptive accuracy, etc., to achieve Effect of reducing influence and improving CoMP transmission performance
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0089] This embodiment is a CS / CB scheduling embodiment of a non-ideal backhaul central scheduling information interaction method;
[0090] Make the following assumptions about the system:
[0091] There are 3 base stations in the system for cooperative transmission: base station 1, base station 2 and base station 3, each of the three base stations has 2 service user terminals, UE1 under base station 1 (CoMP user terminal, the measurement set includes base station 1 and base station 3) and UE2; UE3 (CoMP user terminal, the measurement set includes base station 2 and base station 3) and UE4 under base station 2; UE5 and UE6 under base station 3. Those not marked as CoMP user terminals are non-CoMP user terminals.
[0092] The above three base stations have one scheduling resource;
[0093] The information exchange process between the cooperative base station and the CCN is as follows:
[0094] Step 1: All user terminals report CSI, and each base station transmits the CSI rep...
Embodiment 2
[0104] This embodiment is a DPS / DPB scheduling embodiment of a non-ideal backhaul central scheduling information interaction method;
[0105] The system assumption is the same as that in the first embodiment.
[0106] The information exchange process between the cooperative base station and the CCN is as follows:
[0107] Step 1: All user terminals report CSI, and each base station transmits the CSI information reported by each user terminal to the CCN through backhaul.
[0108] Step 2: CCN schedules base station 1 to be silent, schedules single-point transmission of UE4 for base station 2, and schedules DPS / DPB transmission of UE1 for base station 3;
[0109] The CCN transmits scheduling information to base station 1, the scheduling information includes: the information field indicating silence is "1";
[0110] The CCN transmits scheduling information to the base station 2, and the scheduling information includes: the user terminal identifier "100" of UE4 in the scheduling ...
Embodiment 3
[0117] This embodiment is a JT scheduling embodiment of an information interaction method for non-ideal backhaul central scheduling;
[0118] The system assumptions are the same as those in Embodiment 1 except for the following content: UE1 is a CoMP user terminal, and the measurement set includes base station 1, base station 2, and base station 3; UE3 is a non-CoMP user terminal;
[0119] The information exchange process between the cooperative base station and the CCN is as follows:
[0120] Step 1: All user terminals report CSI, and each base station transmits the CSI reported by each user terminal to the CCN through backhaul.
[0121] Step 2: CCN dispatches base station 1 and base station 2 to perform JT transmission for UE1, and base station 3 performs single-point transmission for UE5;
[0122] The CCN transmits scheduling information for base station 1, and the scheduling information includes: the user terminal identifier "001" of UE1 in the scheduling user identifier ...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com