Electric power system outage cost estimation method based on historical loads of distribution transformer terminals

A technology of historical load and power outage loss, applied in computing, instrumentation, data processing applications, etc., can solve the problems of large error in power outage loss estimation and inability to provide more accurate loss estimates, and achieve the effect of optimizing power outage strategies

Inactive Publication Date: 2014-10-29
FOSHAN POWER SUPPLY BUREAU GUANGDONG POWER GRID
View PDF4 Cites 3 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0002] Counting the power failure loss of an area or a line or even a transformer is one of the most common statistical items in power departments at all levels. However, the load and power are constantly changing, so the traditional statistics of power failure losses can only be based on the real-time power loss of the line at the time of power failure. In ot

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Electric power system outage cost estimation method based on historical loads of distribution transformer terminals

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0025] Below, the present invention will be further described in conjunction with accompanying drawing:

[0026] The preferred embodiment of the present invention realizes the real-time electricity price calculation method based on the historical electricity price of the distribution transformer terminal, including the following steps:

[0027] S1 reads the information of the planned power outage form in the distribution network production management information system, and obtains the power outage switch filled in the power outage form. For example, the power outage switch is 110kV Linyue Station 705, its equipment code is 163188, and the power outage time is from 9:00 to 10:00

[0028] S2 invokes the topology analysis service in the GIS system, and analyzes the distribution transformers affected by the power outage. Input the power failure switch code 163188 in the topology analysis service interface, and the GIS system calculates the network topology, and obtains that the s...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention discloses an electric power system outage cost estimation method based on historical loads of a distribution transformer terminals. The electric power system outage cost estimation method comprises the steps of: S1, obtaining numbers of an outage switch and a looped network power supply switch; s2, analyzing distribution transformers influenced by outage; S3, reading historical load values of each distribution transformer per each 15min, and completely adding together; S4, using the total historical load value of the distribution transformers in the same period of the last week as a reference value, multiplying by a growth factor K, and thereby working out load loss of each time point in the outage period; S5, working out electric quantity loss of different load time points of each distribution transformer in the outage time slot by an integral method; S6, obtaining sold electric quantity and general electricity sales income of each distribution transformer in the last month through a marketing system, and then working out the average price of the sold electricity of the distribution transformers; S7, working out electric charge loss of each distribution transformer influenced by outage at a certain time point; S8, adding together all electric charge loss of the distribution transformers influenced by outage at the certain time point; S9, adding together loss at all time points in the outage time slot. According to the electric power system outage cost estimation method based on historical loads of distribution transformer terminals, loss of electric quantity and electric charge in the outage are accurately and efficiently analyzed.

Description

technical field [0001] The invention relates to a method for estimating power failure loss of a distribution transformer terminal in a power system, in particular to a method for estimating power failure loss of a distribution transformer terminal in a power system based on historical loads. Background technique [0002] Counting the power failure loss of an area or a line or even a transformer is one of the most common statistical items in power departments at all levels. However, the load and power are constantly changing, so the traditional statistics of power failure losses can only be based on the real-time power loss of the line at the time of power failure. In other words, the real-time load value at the moment before the power outage can only be multiplied by the time of power outage, and then multiplied by the unit price of electricity sales of the category to get the estimated value of electricity cost loss. It is impossible to provide a more accurate loss estimate,...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
IPC IPC(8): G06Q50/06
Inventor 黄小耘欧阳卫年黄红远李高明姚若昊罗伟明孔祥轩罗宇
Owner FOSHAN POWER SUPPLY BUREAU GUANGDONG POWER GRID
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products