Concrete faced rockfill dam construction progress simulation method based on parameter analysis and real time monitoring

A face rockfill dam and construction progress technology, applied in the direction of electrical digital data processing, special data processing applications, instruments, etc., can solve the problems of lack of real-time dynamics and other issues

Active Publication Date: 2014-11-12
TIANJIN UNIV
View PDF1 Cites 16 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

However, this method is proposed for the construction characteristics of high arch dams, and the construction technology of high arch dams is essentially different from that of concrete face rockfill dams; in addition, the construction data acquisition in

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Concrete faced rockfill dam construction progress simulation method based on parameter analysis and real time monitoring
  • Concrete faced rockfill dam construction progress simulation method based on parameter analysis and real time monitoring
  • Concrete faced rockfill dam construction progress simulation method based on parameter analysis and real time monitoring

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0062] Including the construction progress simulation modeling of CFRD, the sensitivity analysis of construction parameters in the simulation, and the construction progress simulation based on real-time monitoring, the above three parts together constitute the construction progress simulation method of CFRD based on parameter analysis and real-time monitoring.

[0063] Aiming at the problem of construction progress simulation, the present invention proposes a construction progress simulation method for face rockfill dams based on construction parameter analysis and real-time monitoring. On the basis of fully considering the influence of construction parameters on the simulation progress, through the analysis of construction parameters and statistical analysis of real-time monitoring data, the real-time dynamic acquisition of construction parameters in the simulation can be realized, the simulation accuracy can be improved, the real-time performance of the simulation can be enhan...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention belongs to the technical field of concrete faced rockfill dam construction, and discloses a concrete faced rockfill dam construction progress simulation method based on parameter analysis and real time monitoring. In order to achieve construction parameter real-time dynamic obtaining during simulation, improve simulation precision, enhance simulation real-time performance and enable simulation results to be used for guiding actual construction, according to the technical scheme, the concrete faced rockfill dam construction progress simulation method based on parameter analysis and real time monitoring comprises the steps that (1) a concrete faced rockfill dam construction progress simulation program is built, (2) construction parameters are analyzed, (3) statistical analysis is carried out on key construction parameter monitoring data, (4) the construction progress is simulated and calculated, and (5) key construction links are analyzed. The concrete faced rockfill dam construction progress simulation method based on parameter analysis and real time monitoring is mainly applied to concrete faced rockfill dam construction.

Description

technical field [0001] The invention belongs to the technical field of construction of concrete face rockfill dams, in particular to a method for simulating the construction progress of concrete face rockfill dams based on parameter analysis and real-time monitoring. technical background [0002] The face rockfill dam is the mainstream dam type in the dam industry. Although concrete face rockfill dams are widely used, due to the complex construction process, tight construction schedule and high construction intensity, construction progress management has always been the core issue in the construction of concrete face rockfill dams. [0003] At present, the construction schedule simulation method and technology have been widely used in the feasibility study and design phases of concrete face rockfill dam projects, and it is an important technical support means for scientifically carrying out project planning and design and construction schedule management. However, at presen...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
IPC IPC(8): G06F17/50
Inventor 钟登华胡炜毕磊李正
Owner TIANJIN UNIV
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products