A pressure-controlled open fracturing sleeve
A technology for fracturing sliding sleeves and extensions, which is applied in the direction of production fluid, wellbore/well components, earthwork drilling and production, etc. It can solve the problems of high investment cost and complicated construction, and achieve efficiency improvement, construction volume saving and cost saving Effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0018] In the fracturing operation using cemented sliding sleeves, a high-pressure dead zone is formed in the lower part of the casing after cementing, and the lower layer cannot be directly fractured, so a separate perforation string is required, and the lower layer is drilled after perforation. For fracturing, after the fracturing is completed, the sliding sleeve of the upper layer to be fractured is opened by throwing a ball to perform fracturing on the upper layer. The construction is more complicated and the investment cost is high. Fracturing slides.
[0019] The present invention will be described in further detail below in conjunction with the accompanying drawings.
[0020] A pressure-controlled open fracturing sleeve, such as figure 1 As shown, it includes an upper joint and a lower joint. The upper joint includes an upper joint end 1 and an upper joint extension 2 connected to the upper joint end 1 and extending downward in the axial direction. The joint includes ...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 