A high-speed railway psi settlement monitoring information extraction method
A settlement monitoring and information extraction technology, which is applied to roads, measuring instruments, track superstructures, etc., can solve the problems of high probability of settlement information errors, low efficiency, and the accuracy of results is easily affected by surface subsidence, so as to improve settlement. The effect of monitoring accuracy
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0029] combined with figure 1 The technical scheme of the present invention will be further described. Such as figure 1 As shown, a kind of new method of high-speed railway PSI settlement monitoring information extraction of the present invention comprises the following steps:
[0030] S 1 、Establish the conversion relationship between the plane coordinates of the high-speed rail line and the line mileage
[0031] Discretize the middle line of the high-speed rail line into a point set, and establish attribute information for each discrete point. The attributes include the plane coordinates of the point and the line mileage. The mutual conversion relationship between plane coordinates.
[0032] S 2 , Establish the attribute information of the PS point
[0033] S 2-1 , establish the line segment set of the high-speed rail line position
[0034] Firstly, the high-speed rail discrete point set established by S1 is used to form the line segment set of the high-speed rail li...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 