Unlock instant, AI-driven research and patent intelligence for your innovation.

Resource scheduling method and system for emergency repair of distribution network

A technology for resource scheduling and distribution network, applied in the field of power grid to reduce employee casualties and property losses, improve response speed, and efficiently configure

Active Publication Date: 2019-02-26
ELECTRIC POWER RES INST OF GUANGDONG POWER GRID
View PDF2 Cites 2 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0005] Based on this, it is necessary to solve the problem that there is no resource scheduling method for distribution network emergency repair to coordinate and dispatch distribution network emergency repair resources in order to achieve efficient allocation of emergency repair resources, and to provide a method that can efficiently allocate distribution network emergency repair resources. A method and system for dispatching resources required for emergency repairs of distribution networks that are well coordinated and dispatched in order to achieve efficient allocation of emergency repair resources

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Resource scheduling method and system for emergency repair of distribution network
  • Resource scheduling method and system for emergency repair of distribution network
  • Resource scheduling method and system for emergency repair of distribution network

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0021] In order to make the object, technical solution and advantages of the present invention clearer, the present invention will be further described in detail below according to the drawings and embodiments. It should be understood that the specific implementations described here are only used to explain the present invention, not to limit the present invention.

[0022] like figure 1 As shown, a resource scheduling method for emergency repair of distribution network, including steps:

[0023] S100: Obtain typhoon data and distribution network data, analyze the typhoon data and the distribution network data, and obtain basic data of disaster-affected bodies of the distribution network.

[0024] Typhoon data and distribution network data can be obtained from historical data or real-time data, or a combination of historical data and real-time data. For historical data, it can be the long-term monitoring of typhoon data detected when a certain area suffers from typhoon disas...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention provides a method and system for dispatching resources needed by emergency repair of a power distribution network. Typhoon data and data of the power distribution network are obtained and analyzed, hazard-bearing body foundation data of the power distribution network are calculated, loss, caused by typhoon disasters, of the power distribution network is predicted according to the data, a loss prediction result of the power distribution network is obtained, data of the resources currently needed by the emergency repair are calculated, and the resources needed by the emergency repair of the power distribution network under the typhoon disasters are dispatched according to the data of the resources currently needed by the emergency repair. In the whole process, the resources of the emergency repair are reasonably allocated, the response speed of an emergency repair decision of the power distribution network is increased, the resources of the emergency repair can be allocated efficiently, passive management is converted into active management, the production safety of the power supply bureau is effectively guaranteed, and personnel causalities and property loss are reduced to the greatest extent.

Description

technical field [0001] The invention relates to the technical field of power grids, in particular to a method and system for dispatching resources required for emergency repair of distribution networks. Background technique [0002] For power grids, the losses caused by typhoon disasters rank first among all natural disasters. Guangdong Province is located in an area prone to typhoon disasters. Every year, typhoons cause huge damage to power grid equipment and affect the electricity consumption of the whole society. In 2013, the largest typhoon "Usagi" caused a loss of 57.64 million kWh of electricity, in 2012 the largest "Vicent" caused a loss of 4.7711 million kWh of electricity, and in 2011 the typhoon "Naza" caused a loss of 3.4933 million kWh of electricity. [0003] With the continuous improvement of users' requirements for post-disaster power restoration, the ability to quickly restore power after disasters will directly affect user satisfaction and corporate social ...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Patents(China)
IPC IPC(8): G06Q50/06
CPCG06Q10/0639G06Q50/06Y04S10/50
Inventor 王红斌彭发东高雅黄勇张浒杨强吴昊
Owner ELECTRIC POWER RES INST OF GUANGDONG POWER GRID