Pre-camber setting method for long-span track-specific cable-stayed bridges
A pre-camber, long-span technology, applied in special data processing applications, instruments, electrical digital data processing, etc., can solve the problem of not considering the influence of vehicle-bridge coupling effects on special cable-stayed bridges for long-span tracks, and not targeting long-span tracks. Principles and methods of special cable-stayed bridges, not taking into account short-term effects and long-term effects
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0061] The method for setting the pre-camber of a cable-stayed bridge dedicated to a long-span track according to the present invention obtains bridge geometry and material parameters according to the design and construction requirements, establishes a finite element model, and obtains the displacement value caused by the load factor; determines the elasticity of the hanging basket based on the loading test of the hanging basket Deformation value; Determine the displacement value caused by prestress loss based on the prestress loss test; Determine the shrinkage and creep deformation value during the construction period and the shrinkage and creep deformation value during the operation period based on the concrete model test; Pre-camber caused by displacement, or, establish dynamic equations, and determine the pre-camber caused by vehicle-bridge coupled dynamic displacement by numerical solution; use the vector algorithm to calculate the total pre-camber; check the internal force...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 


