Crane arm loading and unloading method and crane arm
A boom and jib section technology, which is applied to the boom loading and unloading method and the field of booms, and can solve problems such as difficult alignment and hoisting
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0042] Hereinafter, the present invention will be described in detail with reference to the drawings and examples. It should be noted that, in the case of no conflict, the embodiments in the present application and the features in the embodiments can be combined with each other.
[0043] Such as Figures 1 to 9 As shown, according to an embodiment of the present invention, a boom loading method is used for loading a boom. The boom to be hoisted includes a first boom section 11 and a first boom section 11 that needs to be installed in the first boom section 11. The second boom section 20 needs to be hoisted and assembled to the first boom section 11 when the boom is in use, and the second boom section 20 needs to be removed from the first boom section 11 after use. An upper slider 21 is arranged at the tail of the second boom section 20 . Jib loading methods include:
[0044] The first boom section installation adjustment step is to extend the first boom section 11 by the fi...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com