Looking for breakthrough ideas for innovation challenges? Try Patsnap Eureka!

Project investment control and management system and use method thereof

A control management and engineering technology, applied in data processing applications, instruments, logistics, etc., can solve problems such as cumbersome and complex inventory management, and achieve the effects of simple maintenance, accelerated capital turnover, and reduced inventory occupation.

Inactive Publication Date: 2015-04-08
江苏数创智软科技有限公司
View PDF2 Cites 30 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

The inventory management of construction enterprises is often very complicated and cumbersome

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Project investment control and management system and use method thereof
  • Project investment control and management system and use method thereof
  • Project investment control and management system and use method thereof

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0043] In order to better understand the technical content of the present invention, specific embodiments are given together with the attached drawings for description as follows.

[0044] refer to figure 1 , a project investment control management system, including an application server 2, a database server 1, an electronic label 3 and a client 4, the application server 2 is connected to the database server 1 and the client 4 respectively; the application server 2 and the electronic label 3 is connected in a wireless manner, wherein the electronic label 3 is used to bind the electronic label device with the inbound goods, and obtain information on the geographic location of the inbound goods; wherein the application server 2 includes the following modules:

[0045] System setting module; used to complete the printing and setting of reports, and manage the operation log; realize the administrator to add or delete users through the management interface, add new administrators o...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention provides a project investment control and management system and a use method thereof. The system comprises a system setting module, a warehousing module, a warehouse-out module, a warehouse returning module, a requirement module, an electronic tag module and an inventory alarming module. The system has the advantages that smooth material flow in a management process is guaranteed through the management and the control of all warehousing and warehouse-out activities of an investment and construction item and the effective statistics and analysis of inventory data, so that a decision maker can find problems early and adopt a corresponding measure to regulate investment and inventory structures, so that a reservation period is shortened, capital turnover is quickened, and inventory occupation is lowered to a maximum extent; the warehousing and warehouse-out situations of important materials can be monitored at any time, hidden dangers can be found in advance, emergencies can be dealt with in time, system operation complexity is reduced by the intelligent design of the system, and the system has the advantages of being stable and reliable in working and simple in maintenance.

Description

technical field [0001] The present invention relates to the field of engineering comprehensive management, in particular to an engineering investment control management system and its use method. Background technique [0002] The core of modern engineering investment control management is building material management, which specifically refers to the purchase of materials and inventory control. The essence of building material management is actually inventory management. The construction activities of a construction project include various stages such as material procurement, installation, commissioning, trial operation, completion acceptance, etc., and the management of project investment runs through the entire project process, and inventory management is one of the most important in the entire construction process. one of the contents. [0003] Most inventory management theories believe that inventory is the sum of all tangible and intangible materials in physical and lo...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Applications(China)
IPC IPC(8): G06Q10/08
CPCG06Q10/087
Inventor 仲金梅朱楠地
Owner 江苏数创智软科技有限公司
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products