Unlock instant, AI-driven research and patent intelligence for your innovation.

Construction Method of Belgian Road in Test Track

A construction method and test field technology, applied in the directions of roads, roads, paving surfaces paved with prefabricated blocks, etc., can solve the problems of short initial setting time of cement mortar, slow construction progress, affecting the quality and progress of the project, and save labor. and material cost, the effect of improving construction efficiency

Active Publication Date: 2017-03-22
中交一公局第五工程有限公司
View PDF5 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

The construction progress of this construction method is slow, and repeated measurements are required to determine the elevation. Because the initial setting time of cement mortar is short, it often fails or degrades before the elevation is measured, which affects the quality and progress of the project.

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Examples

Experimental program
Comparison scheme
Effect test

Embodiment 1

[0024] A kind of construction method of Belgian road of test track, this Belgian road is wide 3m, long 300m, the road surface that is distributed with different depression characteristics on the road, this construction method comprises the following steps:

[0025] ① Lay cement stabilized stone chip base. Stone chips are stabilized with 20cm of cement.

[0026] ②Use a total-station electronic range finder for coordinate stakeout. Since the road surface is designed to undulate every 5 meters, that is, the interval between the highest point and the lowest point of the curve is 2.5 meters, so the side piles on both sides of the road are released every 2.5 meters and smashed. Steel brazing, to ensure that the smashed steel brazing has a certain stability.

[0027] ③ Use a precision level to measure the elevation of the highest point and the lowest point of the sinusoidal curve of the road surface on the steel drill piles, mark the steel drill piles, and draw a white engineering l...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses a method for constructing a Belgian road in a testing track. Pavements with different sunk characteristics are distributed on the Belgian road. The construction method comprises the following steps: (1) laying a cement steady stone chip layer; (2) carrying out coordinate stake-out by using a full-station electronic distance measuring instrument; (3) measuring sinusoidal altitudes of the highest and lowest points of the pavement on a steel chisel pile by using a precise level, marking on the steel chisel, drawing a white construction line among the steel chisels on each side of the pavement as a reference line according to the mark; (4) mounting Belgian stone blocks; (5) checking the altitude of the Belgian stone blocks; and (6) pouring cracks, namely pouring cracks after mortar reaches certain strength, cleaning and moistening the cracks before treatment, and pouring mortar more than or equal to 52.5# cement into the cracks. Compared with the prior art, the method has the advantages that the construction efficiency is greatly improved and labor and material costs are well saved.

Description

technical field [0001] The invention relates to the field of road surface construction, in particular to a construction method for a Belgian road in a test track. Background technique [0002] The Belgian road is derived from the stone road in Belgium. It is a typical concave and convex bad road. It is named as a representative of a typical bad road. It is a road test for the reliability and durability of the vehicle quality. The length of the Belgian road of a typical proving ground is not less than 500 meters. The conventional construction method is to directly pave stones on the original terrain, and rely on manual determination of elevation with a ruler. The construction progress of this construction method is slow, and repeated measurements are required to determine the elevation. Because the initial setting time of cement mortar is short, it often fails or degrades before the elevation is measured, which affects the quality and progress of the project. Contents of t...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Patents(China)
IPC IPC(8): E01C5/02E01C3/04
Inventor 赵铁拓潘志诚张旭韩凤会刘航杨茗方支怡琳邹海涛张川海萌萌李昌远
Owner 中交一公局第五工程有限公司