Novel construction method for closing traffic in short time
A new method and transportation technology, applied in artificial islands, water conservancy projects, infrastructure engineering, etc., can solve the uneconomical problems of cover plate removal, achieve the effect of high rigidity, controllable construction period, and reduce formation deformation
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0025] The present invention will be described in detail below in conjunction with the accompanying drawings.
[0026] like figure 1 As shown, the fence 1 is used to close the road, the traffic is interrupted, and the construction machinery is stationed at the construction closed road site, and the construction of the enclosure structure 2, the water stop system 3 and the support column pile 4 is carried out in the temporary construction site.
[0027] like figure 2 As shown, excavate the earthwork on the ground of the temporary construction site to the bottom elevation of the structural roof 6, and reserve the precipitation system 10, then lay the formwork, complete the structural roof 6 and reserve the pouring structure, and use the pipeline protection device 5 to check the temporary construction site. The pipelines are protected in situ.
[0028] like image 3 As shown, according to the subgrade requirements, backfill the earth above the structural roof 6 and compact it...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com