Hanging basket structure for high crossbeam lower surface monitoring point arrangement and installation method
A measuring point arrangement and beam technology, which is applied in the direction of housing structure support, housing structure support, scaffolding supported by housing structure, etc., can solve the problems of low efficiency, time-consuming and material-consuming, and achieve accurate positioning, improve stability, and improve applicability. Effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0047] The installation method of the hanging basket structure used for the arrangement of monitoring and measuring points on the lower surface of the high-altitude beam comprises the following steps:
[0048] (1) Lift the hanging basket with a crane or a chain block, so that the two hanging baskets 1 are symmetrically placed on the left and right sides of the middle beam 11 .
[0049] (2) The span of the horizontal part of the "Π" shape frame 2 is placed on the upper surface of the middle cross beam 11, and the positioning steel plate 8 and the adjustment steel plate 9 on the lower chord of the "Π" shape frame 2 horizontal part are connected with the middle cross beam 11 Close the two sides of the hanging basket, pass the lead screw through the round holes on the positioning steel plate 8 and the adjustment steel plate 9, fasten the screw 10 with nuts, clamp the middle beam 11 with the positioning steel plate 8 and the adjustment steel plate 9, and make the hanging basket hori...