A kind of stainless steel tube production method for condenser
A technology of stainless steel pipe and production method, which is applied in the field of stainless steel production process improvement, can solve the problems of not being suitable for preparing condensers, swelling and immobility, etc., and achieve the effects of eliminating fine cracks on the surface, improving stability, and high surface quality
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Examples
Embodiment 1
[0047] The production method of the stainless steel tube used in the condenser includes the steps of: round steel raw material—peeling—perforation—barren pipe—polishing—inspection—cold rolling—cold drawing—degreasing—annealing—pickling—finished product;
[0048] The chemical composition mass content in the round steel raw material is:
[0049] C 0.025%
[0050] Mn 1.4%
[0051] Si 0.3%
[0052] P 0.033%
[0053] S 0.001%
[0054] Cr 18.05%
[0055] Ni 8.13%;
[0056] Annealing is carried out in stages, the temperature is 750°C, 950°C, 1040°C, 1060°C, 1060°C in sequence, the annealing speed is 0.6 m / min, and the fourth and fifth stages are heat preservation stages for a total of 13 minutes;
[0057] Pickling is specifically to use 36wt% industrial hydrofluoric acid and 96% industrial nitric acid for pickling according to the mass ratio of 5wt% and 10wt% mixed acid. The pickling temperature is 40°C; the pickling time is 4.5 hours .
[0058] For the finished product of 06...
Embodiment 2
[0064] The production method of the stainless steel tube used in the condenser includes the steps of: round steel raw material—peeling—perforation—barren pipe—polishing—inspection—cold rolling—cold drawing—degreasing—annealing—pickling—finished product;
[0065] The chemical composition mass content in the round steel raw material is:
[0066] C 0.035%
[0067] Mn 1.7%
[0068] Si 0.45%
[0069] P 0.035%
[0070] S 0.003%
[0071] Cr 18.30%
[0072] Ni 8.03%;
[0073] Annealing is carried out in stages, the temperature is 780°C, 970°C, 1050°C, 1065°C, 1065°C in sequence, the annealing speed is 0.8 m / min, and the fourth and fifth stages are heat preservation stages for a total of 16 minutes;
[0074] Pickling is specifically to use 38wt% industrial hydrofluoric acid and 98% industrial nitric acid for pickling according to the mass ratio of 8wt% and 15wt% mixed acid. The pickling temperature is 60°C; the pickling time is 5.5 hours .
[0075] For the finished product of 06C...
Embodiment 3
[0081] The production method of the stainless steel tube used in the condenser includes the steps of: round steel raw material—peeling—perforation—barren pipe—polishing—inspection—cold rolling—cold drawing—degreasing—annealing—pickling—finished product;
[0082] The chemical composition mass content in the round steel raw material is:
[0083] C 0.030%
[0084] Mn 1.6%
[0085] Si 0.35%
[0086] P 0.034%
[0087] S 0.002%
[0088] Cr 18.1%
[0089] Ni 8.08%.
[0090] Annealing is carried out in stages, the temperature is 760°C, 960°C, 1040°C, 1070°C, 1070°C in sequence, and the annealing speed is 0.7 m / min. The fourth and fifth stages are heat preservation stages for a total of 15 minutes.
[0091] Pickling is specifically to use 39wt% industrial hydrofluoric acid and 97% industrial nitric acid for pickling according to the mass ratio of 7wt% and 12wt% mixed acid, the pickling temperature is 50 ° C; the pickling time is 5 hours .
[0092] For the finished product of 06...
PUM
| Property | Measurement | Unit |
|---|---|---|
| thickness | aaaaa | aaaaa |
| tensile strength | aaaaa | aaaaa |
| tensile strength | aaaaa | aaaaa |
Abstract
Description
Claims
Application Information
Login to View More