A construction method for grouting and tool change in the chamber of earth pressure balance shield tunneling machine in sand layer

A technology of earth pressure balance and construction method, which is applied in earthwork drilling, wellbore lining, tunnel lining, etc. It can solve problems such as unclear grouting construction methods, poor gas retention capacity of sand layers, and difficulties in reinforcement construction, etc., to avoid Advance grouting construction operations, short construction time, and reduced construction workload

Inactive Publication Date: 2018-02-09
SHANGHAI JIAOTONG UNIV
View PDF2 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0004] Aiming at the defects in the prior art, the purpose of the present invention is to provide a construction method for grouting and tool change in the earth pressure balance shield machine cabin in the sand layer, which overcomes the inability of the ground to be reinforced and the gas retention capacity of the sand layer in the prior art. Poor, easy to block the grouting port, unclear grouting construction operation method, difficult construction of advance grouting reinforcement and heavy workload and other shortcomings and shortcomings, to realize the safe tool change of the earth pressure balance shield machine under the condition of no ground reinforcement in the sand layer construction

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • A construction method for grouting and tool change in the chamber of earth pressure balance shield tunneling machine in sand layer
  • A construction method for grouting and tool change in the chamber of earth pressure balance shield tunneling machine in sand layer
  • A construction method for grouting and tool change in the chamber of earth pressure balance shield tunneling machine in sand layer

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0041] The present invention will be described in detail below in conjunction with specific embodiments. The following examples will help those skilled in the art to further understand the present invention, but do not limit the present invention in any form. It should be noted that those skilled in the art can make several modifications and improvements without departing from the concept of the present invention. These all belong to the protection scope of the present invention.

[0042] like Figure 1-3 As shown, this embodiment provides a construction method for grouting and tool change in the earth pressure balance shield machine chamber in the sand layer, which is used in a tunnel in Guangzhou; the depth of the bottom of the shield machine cutter head is 14m underground, and the ground above the stop position is At intersections, in order to prevent damage to the structure of the cutter head due to excessive wear, bursting and jamming of the cutter, which will affect th...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention provides a construction method for grouting and tool change in the earth pressure balance shield machine chamber in the sand layer. The steps of the method include: the first step, injecting bentonite mud into the soil chamber; the second step, replacing the soil with air The muck slurry in the bin; the third step, filling the void under pressure; the fourth step, backfilling the soil bin; the fifth step, clearing the bin and changing the tool; the sixth step, resuming the excavation. The present invention aims at the problem of earth pressure balance shield machine filling and changing tools under the condition of no ground reinforcement in the sand layer, avoids the difficult advanced grouting construction operation, clarifies the grouting construction operation mode, and prevents the cement mortar in the screw conveyor Hardening causes equipment damage, which effectively reduces the construction workload; the invention has short construction time, high efficiency and strong safety.

Description

technical field [0001] The invention relates to a construction method in the technical field of tunnel engineering, in particular to a construction method for grouting and tool change in an earth pressure balance shield machine chamber in a sand layer. Background technique [0002] In recent years, with the continuous advancement of China's urbanization process, the problem of urban traffic congestion has become more and more serious. The construction of subway tunnels can solve or improve the current situation of urban traffic, so it has been widely used. These subway tunnels need to be constructed using the shield method. The earth pressure balance shield method is a fully mechanical construction method commonly used in shield tunneling construction. It uses an earth pressure balance shield machine to cut the soil through the cutter head in front of the shield machine and pass the muck through the screw conveyor. After being transported out of the tunnel, the shield mach...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Patents(China)
IPC IPC(8): E21D9/08E21D11/10
Inventor 刘方沈水龙张宁吴怀娜
Owner SHANGHAI JIAOTONG UNIV