A construction method for grouting and tool change in the chamber of earth pressure balance shield tunneling machine in sand layer
A technology of earth pressure balance and construction method, which is applied in earthwork drilling, wellbore lining, tunnel lining, etc. It can solve problems such as unclear grouting construction methods, poor gas retention capacity of sand layers, and difficulties in reinforcement construction, etc., to avoid Advance grouting construction operations, short construction time, and reduced construction workload
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0041] The present invention will be described in detail below in conjunction with specific embodiments. The following examples will help those skilled in the art to further understand the present invention, but do not limit the present invention in any form. It should be noted that those skilled in the art can make several modifications and improvements without departing from the concept of the present invention. These all belong to the protection scope of the present invention.
[0042] like Figure 1-3 As shown, this embodiment provides a construction method for grouting and tool change in the earth pressure balance shield machine chamber in the sand layer, which is used in a tunnel in Guangzhou; the depth of the bottom of the shield machine cutter head is 14m underground, and the ground above the stop position is At intersections, in order to prevent damage to the structure of the cutter head due to excessive wear, bursting and jamming of the cutter, which will affect th...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 