A construction method of filling and changing tools for reinforcement in the shield machine chamber
A construction method and technology of shield machine, which are used in earth-moving drilling, mining equipment, tunnels, etc., can solve the problems of easy blockage of grouting ports, long time consumption, and heavy workload, so as to reduce the amount of clearance work and reduce the difficulty of removal. , The effect of preventing equipment damage
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0055] The present invention will be described in detail below in conjunction with specific embodiments. The following examples will help those skilled in the art to further understand the present invention, but do not limit the present invention in any form. It should be noted that those skilled in the art can make several modifications and improvements without departing from the concept of the present invention. These all belong to the protection scope of the present invention.
[0056] Such as Figure 1-5 As shown, the present embodiment provides a construction method of filling a shield machine cabin for reinforcement and changing tools (specifically, a method for filling and changing tools for reinforcement in a shield machine cabin with an earth pressure balance in an overlying sandy soil lying limestone stratum). Construction method), used in a tunnel in Guangzhou, the depth of the bottom of the cutterhead of the shield machine is 14m underground, and the ground above...