Reinforced warehouse-filling cutter-replacement construction method in shield tunneling machine warehouse

A construction method and shield machine technology, which is applied to earthwork drilling, mining equipment, tunnels, etc., can solve problems such as easy blockage of grouting openings, long time consumption, and heavy workload, so as to reduce the workload of clearing warehouses and reduce the difficulty of demolition , the effect of preventing equipment damage

Inactive Publication Date: 2016-01-20
SHANGHAI JIAO TONG UNIV
View PDF8 Cites 6 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0004] Aiming at the defects in the prior art, the object of the present invention is to provide a construction method for filling and changing tools for reinforcement in the shield machine chamber, which overcomes the inability of the ground to be reinforced, the poor gas retention capacity of the sand layer, and the injection The grout mouth is easy to block, the grouting construction method is not clear, it is difficult and time-consuming to break the hardened cement mortar in the process of clearing the warehouse, and the advanced grouting reinforcement construction is difficult and the workload is heavy. Safe tool change construction of earth pressure balance shield machine

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Reinforced warehouse-filling cutter-replacement construction method in shield tunneling machine warehouse
  • Reinforced warehouse-filling cutter-replacement construction method in shield tunneling machine warehouse
  • Reinforced warehouse-filling cutter-replacement construction method in shield tunneling machine warehouse

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0055] The present invention will be described in detail below in conjunction with specific embodiments. The following examples will help those skilled in the art to further understand the present invention, but do not limit the present invention in any form. It should be noted that those skilled in the art can make several modifications and improvements without departing from the concept of the present invention. These all belong to the protection scope of the present invention.

[0056] Such as Figure 1-5 As shown, the present embodiment provides a construction method of filling a shield machine cabin for reinforcement and changing tools (specifically, a method for filling and changing tools for reinforcement in a shield machine cabin with an earth pressure balance in an overlying sandy soil lying limestone stratum). Construction method), used in a tunnel in Guangzhou, the depth of the bottom of the cutterhead of the shield machine is 14m underground, and the ground above...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

PropertyMeasurementUnit
thicknessaaaaaaaaaa
thicknessaaaaaaaaaa
thicknessaaaaaaaaaa
Login to view more

Abstract

The invention provides a reinforced warehouse-filling cutter-replacement construction method in a shield tunneling machine warehouse. The method comprises the following steps: the first step: grouting a soil warehouse with bentonite slurry; the second step: replacing muck and slurry in the soil warehouse with air; the third step: filling gaps under pressure; the fourth step: connecting sleeve valve tubes; the fifth step: grouting cement mortar to backfill the soil warehouse; the sixth step: injecting an accelerator into cement mortar at the front part of the soil warehouse, and injecting a retarder into cement mortar at the rear part of the soil warehouse; the seventh step: cleaning up the soil warehouse for cutter replacement; the eighth step: recovering tunneling. With the adoption of the method provided by the invention, the difficult pre-grouting construction operation is avoided, the situation that equipment is damaged due to hardening of cement mortar in a screw conveyer is prevented, a grouting construction operation mode is defined, the difficulty of breaking and removing hardened bodies in the soil warehouse is reduced, the workload for cleaning up the warehouse is reduced effectively, the construction time is short, the efficiency is high and the safety is high.

Description

technical field [0001] The invention relates to a construction method in the technical field of tunnel engineering, in particular to a construction method for filling and changing tools for reinforcement in a shield machine chamber. Background technique [0002] At present, the construction of subway tunnels at home and abroad is developing rapidly, and these subway tunnels need to be constructed by the shield method. Shield tunneling has developed rapidly in many cities due to its advantages of safety, high efficiency and high degree of mechanization. The earth pressure balance shield method is a fully mechanical construction method commonly used in shield tunneling construction. It uses an earth pressure balance shield machine to cut the soil through the cutter head in front of the shield machine and pass the muck through the screw conveyor. After being transported out of the tunnel, the shield machine is pushed forward under the support of the casing and segments. Durin...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
Patent Type & Authority Applications(China)
IPC IPC(8): E21D9/08
Inventor 刘方沈水龙吴怀娜
Owner SHANGHAI JIAO TONG UNIV
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products