Tool changing construction method for in-chamber grouting of earth pressure balance shield machine in sand bed

A technology of earth pressure balance and construction method, which is applied in earth-moving drilling, wellbore lining, tunnel lining and other directions, can solve the problems of unclear grouting construction operation method, poor air-holding ability of sand layer, and easy blockage of grouting port, etc. Achieve the effect of avoiding advanced grouting construction operations, shortening construction time and reducing construction workload

Inactive Publication Date: 2016-01-20
SHANGHAI JIAO TONG UNIV
View PDF6 Cites 9 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0004] Aiming at the defects in the prior art, the purpose of the present invention is to provide a construction method for grouting and tool change in the earth pressure balance shield machine cabin in the sand layer, which overcomes the inability of the ground to be reinforced and the gas retention capacity of the sand layer in the prior art. Poor, easy to block the grouting port, unclear grouting construction operation method, difficult construction of advance grouting reinforcement and heavy workload and other shortcomings and shortcomings, to realize the safe tool change of the earth pressure balance shield machine under the condition of no ground reinforcement in the sand layer construction

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Tool changing construction method for in-chamber grouting of earth pressure balance shield machine in sand bed
  • Tool changing construction method for in-chamber grouting of earth pressure balance shield machine in sand bed
  • Tool changing construction method for in-chamber grouting of earth pressure balance shield machine in sand bed

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0041] The present invention will be described in detail below in conjunction with specific embodiments. The following examples will help those skilled in the art to further understand the present invention, but do not limit the present invention in any form. It should be noted that those skilled in the art can make several modifications and improvements without departing from the concept of the present invention. These all belong to the protection scope of the present invention.

[0042] Such as Figure 1-3 As shown, this embodiment provides a construction method for grouting and tool change in the earth pressure balance shield machine chamber in the sand layer, which is used in a tunnel in Guangzhou; the depth of the bottom of the shield machine cutter head is 14m underground, and the ground above the stop position is At intersections, in order to prevent damage to the structure of the cutter head due to excessive wear, bursting and jamming of the cutter, which will affect...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention provides a tool changing construction method for in-chamber grouting of an earth pressure balance shield machine in sand bed. The tool changing construction method comprises the following steps: step 1, injecting bentonite slurry into a soil chamber; step 2, replacing air with muck slurry in the soil chamber; step 3, performing pressurized gap filling; step 4, backfilling the soil chamber; step 5, cleaning the chamber and exchanging tools; step 6, recovering tunneling. The tool changing construction method is used for chamber filling tool exchanging of the earth pressure balance shield machine in sand bed without ground reinforcing conditions, avoids difficult advanced grouting construction operation, makes clear the grouting construction operation mode, prevents cement mortar in a screw conveyor from being hardened to cause equipment damages, effectively reduces the construction operation workload, and is short in construction time and high in efficiency and safety.

Description

technical field [0001] The invention relates to a construction method in the technical field of tunnel engineering, in particular to a construction method for grouting and tool change in an earth pressure balance shield machine chamber in a sand layer. Background technique [0002] In recent years, with the continuous advancement of China's urbanization process, the problem of urban traffic congestion has become more and more serious. The construction of subway tunnels can solve or improve the current situation of urban traffic, so it has been widely used. These subway tunnels need to be constructed using the shield method. The earth pressure balance shield method is a fully mechanical construction method commonly used in shield tunneling construction. It uses an earth pressure balance shield machine to cut the soil through the cutter head in front of the shield machine and pass the muck through the screw conveyor. After being transported out of the tunnel, the shield mach...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
IPC IPC(8): E21D9/08E21D11/10
Inventor 刘方沈水龙张宁吴怀娜