Supercharge Your Innovation With Domain-Expert AI Agents!

Construction method for tensile type bond-free pre-stressed anchor cable

A technology of prestressed anchor cables and construction methods, which is applied in the direction of foundation structure engineering, buildings, sheet pile walls, etc., and can solve the problem of large scale and difficulty in slope excavation and reinforcement, complex engineering geological and hydrogeological conditions, and construction methods. Problems such as failure to meet the requirements, achieving significant economic and social benefits, reducing the weight of structures, and improving stability

Inactive Publication Date: 2016-02-03
中国安能集团第一工程局有限公司
View PDF2 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

The vertical and horizontal sections of the stilling pond are all trapezoidal sections. One side of the stilling pond is a permanent high slope, and the maximum height of the slope excavation can reach more than 200 meters. Moreover, the engineering geology and hydrogeological conditions of the hydropower station are relatively complicated. The slope excavation and The scale and difficulty of reinforcement treatment are relatively large. Shallow support and deep support are used in slope reinforcement treatment. Since the prestressed anchor cable is fast and effective and has the characteristics of little disturbance to the slope, the current construction method is not up to the standard. To meet the requirements, the application of prestressed anchor cables has been greatly restricted, especially for deep support, and the support effect after construction is poor

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Examples

Experimental program
Comparison scheme
Effect test

Embodiment 1

[0019] The construction method of tension type non-adhesive prestressed anchor cable of the present invention, its main steps are:

[0020] (1) Tension-type non-adhesive prestressed anchor cable method adopts anchor cable drilling rig to make holes, and the cable body is mainly installed manually, supplemented by mechanical installation. The guide instrument controls the inclination, the depth and diameter of the drilled hole meet the design value, and the hole position, inclination and azimuth of the drilled hole meet the design value;

[0021] (2) Collect the rock dust at the two places where the anchor cable is fixed, conduct strength analysis, determine that the fixed section of the anchor cable is located in a stable rock formation, determine the depth of the installation hole according to the hardness of the rock formation, and adopt the casing follow-up method;

[0022] (3) The blanking length of the steel hinge line is determined according to the actual drilling depth ...

Embodiment 2

[0031] The construction method of tension type non-adhesive prestressed anchor cable of the present invention, its main steps are:

[0032] (1) Tension-type non-adhesive prestressed anchor cable method adopts anchor cable drilling rig to make holes, and the cable body is mainly installed manually, supplemented by mechanical installation. The guide instrument controls the inclination, the depth and diameter of the drilled hole meet the design value, and the hole position, inclination and azimuth of the drilled hole meet the design value;

[0033] (2) Collect the rock dust at the two places where the anchor cable is fixed, conduct strength analysis, determine that the fixed section of the anchor cable is located in a stable rock formation, determine the depth of the installation hole according to the hardness of the rock formation, and adopt the casing follow-up method;

[0034] (3) The blanking length of the steel hinge line is determined according to the actual drilling depth ...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention relates to a building construction method, in particular to a construction method for a tensile type bond-free pre-stressed anchor cable used for high-slope support engineering in water-power engineering. After the construction method for the tensile type bond-free pre-stressed anchor cable is adopted, frictional resistance on the shearing surface of an instable mountain and a stable mountain is increased through a bond-free pre-stressed anchor cable deep support, and meanwhile acting force of slope sliding is resisted; the instable mountain and the stable mountain are firmly combined into a whole, the stability of a slope is improved, a structural fracture is prevented from further developing, and the purposes of protection and firmness are achieved; late-period slope safety monitoring data show that the high slope of a plunge pool basically tends to be stable. Meanwhile, through the bond-free pre-stressed anchor cable support, the self-weight of the structure is greatly reduced, engineering materials are reduced, engineering safety and stability are ensured, and the construction method has remarkable economic benefits and social benefits.

Description

technical field [0001] The invention relates to a building construction method, in particular to a construction method for a tension type non-adhesive prestressed anchor cable used in a high side slope support project in a hydropower project. Background technique [0002] The exit of the open spillway of the hydropower station is provided with a deflector nose sill and a stilling pond, and the water flow is deflected into the stilling pond for energy dissipation. The vertical and horizontal sections of the stilling pond are all trapezoidal sections. One side of the stilling pond is a permanent high slope, and the maximum height of the slope excavation can reach more than 200 meters. Moreover, the engineering geology and hydrogeological conditions of the hydropower station are relatively complicated. The slope excavation and The scale and difficulty of reinforcement treatment are relatively large. Shallow support and deep support are used in slope reinforcement treatment. Sin...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Applications(China)
IPC IPC(8): E02D5/74
Inventor 张耀威刘胜徐晓刚刘贺举梁龙群贺博文陆伟朱江伍绍华
Owner 中国安能集团第一工程局有限公司
Features
  • R&D
  • Intellectual Property
  • Life Sciences
  • Materials
  • Tech Scout
Why Patsnap Eureka
  • Unparalleled Data Quality
  • Higher Quality Content
  • 60% Fewer Hallucinations
Social media
Patsnap Eureka Blog
Learn More