Unlock instant, AI-driven research and patent intelligence for your innovation.

Medium and long term power grid planning method for optimizing new energy construction and grid connected time sequence

A power grid planning and new energy technology, applied in instruments, data processing applications, forecasting, etc., can solve problems such as rational dependence and difficulty in obtaining power grid planning solutions

Inactive Publication Date: 2016-05-25
STATE GRID XINJIANG ELECTRIC POWER CO ECONOMIC TECH RES INST +2
View PDF0 Cites 6 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0004] Existing power grid planning methods are rarely proposed for new energy grid integration, and generally only select the best planning schemes by considering technical and economic indicators, and the rationality of such schemes often depends on the experience of planners , it is difficult to obtain the optimal power grid planning scheme; in addition, most of the existing power grid planning methods are based on the load growth trend, under the constraints of system operation security and other constraints, and aim at the minimum investment cost to determine the new line, without in the planning process Considering the development of new energy sources, there are certain limitations

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Medium and long term power grid planning method for optimizing new energy construction and grid connected time sequence
  • Medium and long term power grid planning method for optimizing new energy construction and grid connected time sequence
  • Medium and long term power grid planning method for optimizing new energy construction and grid connected time sequence

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0050] The present invention will be further described in detail below in conjunction with the accompanying drawings and specific embodiments.

[0051] A medium and long-term power grid planning method for optimizing new energy construction and grid connection timing, comprising the following steps:

[0052] Step S1: Obtain system operation forecast data: including grid structure data, new energy planning data and new energy consumption level; the system operation forecast data includes load growth forecast data, installed capacity of each power source, and upper and lower limits of unit output value; the grid structure data includes the total number of nodes N of the grid, and at this stage, the new energy sending line set Ω is limited 0 And the transmission power limit value of each line It is allowed to create a new line corridor m, and the line corridor allows the number of new lines n m , the new energy capacity S caused by the new line k k , the transmission power li...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses a medium and long term power grid planning method for optimizing new energy construction and the grid connected time sequence. The method comprises the steps that S1) system operation prediction data, grid structure data, new energy plan data and the expected absorption level of new energy are obtained; S2) a power grid plan model is established; S3) the power grid plan model is solved; S4) a new energy and new line construction time sequence model is established; and S5) the new energy and new line construction time sequence model is solved. According to the invention, the absorption level of new energy is effectively improved to solve the problem that output of new energy is limited; and when the power grid is planned, both increasing trend of the system load and growth of new energy installation are considered, the new energy absorption problem is comprehensively considered from the aspects including the peak capability, the grid configuration limitation, the trend distribution, the system operation cost and the operation benefit, and the new line and new energy construction time sequence is optimized so that the utilization rate of new lines and the operation benefit of new energy are optimized.

Description

technical field [0001] The invention relates to a medium-to-long-term power grid planning method, in particular to a medium-to-long-term power grid planning method for optimizing new energy construction and grid connection timing, and belongs to the technical field of power grid planning. Background technique [0002] The development of wind power, photovoltaic and other new energy power generation has shown obvious economic and environmental benefits. In the future, new energy will occupy an increasingly important position in my country's power grid structure. However, the random fluctuation characteristics of new energy output bring challenges to the safe and stable operation of the power grid. Due to the insufficient transmission capacity of the grid grid, the abandonment of wind and light seriously restricts the large-scale grid integration of new energy. Therefore, it is urgent to establish a grid planning method for new energy consumption, so that the grid structure of...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Applications(China)
IPC IPC(8): G06Q10/04G06Q50/06
CPCY02E40/70Y04S10/50
Inventor 吕盼张增强康玉函李永刚付超宋新甫徐龙秀付高善沈超秦潇璘周专关洪浩辛超山王洪涛许叶林
Owner STATE GRID XINJIANG ELECTRIC POWER CO ECONOMIC TECH RES INST
Features
  • R&D
  • Intellectual Property
  • Life Sciences
  • Materials
  • Tech Scout
Why Patsnap Eureka
  • Unparalleled Data Quality
  • Higher Quality Content
  • 60% Fewer Hallucinations
Social media
Patsnap Eureka Blog
Learn More