3D construction system and construction method of earth-rock dam
A construction method and technology of earth-rock dams, applied in the direction of dams, barrages, barrages, etc., can solve the problems of large amount of human intervention, long construction time, inconvenience for engineers and construction personnel, etc., and achieve the effect of realizing intelligence
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0019] The technical solution of the present invention will be further described in detail below according to the drawings in the description and in combination with specific embodiments.
[0020] Please also refer to figure 1 and figure 2 The 3D construction system 100 of the earth-rock dam provided by the embodiment of the present invention includes an engineering construction scheduling module 10 and a 3D construction assembly line operation module 20, and the engineering construction scheduling module 10 is used to schedule the construction process of the earth-rock dam , and send the scheduling instruction to the 3D construction assembly line operation module 20; after receiving the scheduling instruction, the 3D construction assembly line operation module 20 completes the construction of the earth-rock dam according to the scheduling instruction.
[0021] The engineering construction scheduling module 10 includes an engineering construction 3D digital model module 110 ...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com