A design method of pile group combined anchorage suitable for large-tonnage cable crane
A technology of cable crane and design method, which is applied in the direction of sheet pile wall, building, foundation structure engineering, etc., can solve the problems that the horizontal bearing force cannot fully meet the needs of the project, construction inconvenience, cost increase, etc., and achieve significant economical and Applicability, optimal force, effect of reducing quantity
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0031] The present invention will be described in detail below in conjunction with the accompanying drawings.
[0032] Such as figure 1 As shown, the combined pile group anchorage includes a pile group foundation 10 and an additional auxiliary prestressed anchor cable 20, and the main cable 30 of the cable crane (not shown in the figure) is connected as a whole with the pile group foundation 10 through an anchoring structure. The anchoring structure includes an anchor box 40 and an embedded part 41 , and the anchor box 40 is anchored on the pile group foundation 10 through the embedded part 41 as a connecting piece between the pile group foundation 10 and the main cable 30 .
[0033] The invention provides a pile group combined anchorage design method suitable for large-tonnage cable cranes, combining figure 2 , before the main cable 30 is anchored, after the prestressed anchor cable 20 is stretched for the first time, the reaction force on the pile group foundation 10 is op...