A vertical external pull ground anchor pile tube groove foundation pit protection wall structure and construction method

A construction method and technology of ground anchor piles, which are applied in basic structure engineering, excavation, construction, etc., can solve the problems of slow progress of wall protection, long construction period, long excavation longitudinally, etc., and achieve simple process, simple operation, and guaranteed stability. Effect

Active Publication Date: 2018-01-16
DALIAN UNIV
View PDF6 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

The excavation of underground pipe trench foundation pit is long vertically and narrow horizontally, and the service period of pipe trench foundation pit is short. The conventional foundation pit support method has the characteristics of high cost of retaining wall, long construction period and slow progress of retaining wall, which is difficult to meet the requirements of pipe trench. engineering wall requirements
At present, the existing pipe trench foundation pit of the pipeline project is in the state of exposed vertical steep slope. During the excavation and use of the pipe trench foundation pit, the on-site work has a great construction risk, and it also has a great impact on the traffic and environment along the pipeline project. big security risk

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • A vertical external pull ground anchor pile tube groove foundation pit protection wall structure and construction method
  • A vertical external pull ground anchor pile tube groove foundation pit protection wall structure and construction method
  • A vertical external pull ground anchor pile tube groove foundation pit protection wall structure and construction method

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0028] Attached below Figure 1-3 The present invention is described further:

[0029] A vertical external pull ground anchor pile pipe groove foundation pit wall protection structure, the pipe groove bottom near the two sides of the groove wall anchor piles 1 are installed in the pipe groove, the pipeline fixing base 4 is arranged between the pipe groove anchor piles 1 at the bottom of the groove Between the groove wall and the anchor pile 1 in the pipe groove, an extrusion block a2 is set, and an extrusion block b3 is arranged between the anchor pile 1 in the pipe groove and the pipeline fixing base 4, and the anchor pile 1 in the pipe groove is connected by a screw connection 5. Connect the vertical column 10, erect the horizontal tie rod a9 above the pipeline to be erected, the two ends of the horizontal tie rod a9 are connected to the vertical columns 10 on both sides of the pipeline 7 to be erected through the right-angle fastener 8, and the top of the vertical column 10...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses a vertical external pulling ground anchor pile pipe channel foundation pit protecting wall structure and a construction method thereof. A pipeline fixing base is arranged between two adjacent ground anchor piles in a pipe channel and at the bottom of the pipe channel, extrusion blocks a are arranged between the wall of the pipe channel and the ground anchor piles in the pipe channel, extrusion blocks b are arranged between the ground anchor piles in the pipe channel and the pipeline fixing base, the ground anchor piles in the pipe channel are connected with longitudinal vertical columns by virtue of screw thread connecting pipes, horizontal pull rods a are erected above to-be-erected pipelines, the two ends of the horizontal pull rods a are connected with longitudinal vertical columns on two sides of the to-be-erected pipelines by virtue of right-angle couplers, the top ends of the longitudinal vertical columns exceed the upper end of a pipe channel foundation pit, and are connected with horizontal pull rods b by virtue of square elbows, the horizontal pull rods b are connected with the end parts of ground anchor piles outside the foundation pit, protection nets are hung on the side walls, close to the walls of the pipe channel, of the longitudinal vertical columns above the extrusion blocks a, and a horizontal pull rod c is arranged between the two adjacent longitudinal vertical columns on the same sides of the to-be-erected pipelines. The vertical external pulling ground anchor pile pipe channel foundation pit protecting wall structure has the beneficial effects that the inner and outer ground anchor pile combined vertical pipe channel foundation pit protection wall structure is safe and firm, can be recycled and reused, is economic and applicable, is simple to operate, and is concise in process.

Description

technical field [0001] The invention relates to a wall protection structure and a construction method of a foundation pit, in particular to a wall protection structure and a construction method of a vertical pipe groove externally pulled ground anchor pile. Background technique [0002] In the process of urbanization, underground pipeline projects are increasing. The excavation of underground pipe trench foundation pit is long vertically and narrow horizontally, and the service period of pipe trench foundation pit is short. The conventional foundation pit support method has the characteristics of high cost of retaining wall, long construction period and slow progress of retaining wall, which is difficult to meet the requirements of pipe trench. Engineered retaining wall requirements. At present, the existing pipe trench foundation pit of the pipeline project is in the state of exposed vertical steep slope. During the excavation and use of the pipe trench foundation pit, the...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Patents(China)
IPC IPC(8): E02D17/08
CPCE02D17/08E02D17/083
Inventor 李金奎李霞
Owner DALIAN UNIV