Prefabricated hollow bamboo floor slab and preparation method thereof
A bamboo building and hollow technology, applied in the direction of floor slabs, manufacturing tools, building components, etc., can solve the problems of imperfect design theory of prefabricated bamboo structures, unfavorable standardized production, backward design methods, etc., to facilitate standardized production and facilitate building assembly. , the effect of easy quality control
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
preparation example Construction
[0023] The preparation method of prefabricated hollow bamboo floor slab:
[0024] 1) All parts of the prefabricated hollow bamboo slab are assembled together, that is, the upper panel of the high-strength industrialized bamboo panel and the upper part of the industrialized bamboo rib are connected by shear-resistant bamboo pins, and the lower panel of the high-strength industrialized bamboo panel and the lower part of the industrialized bamboo rib are connected by shear-resistant Bamboo pins are connected, and industrialized bamboo ribs are placed at equal intervals between the upper and lower panels to form holes parallel to the force direction of the floor. The overall floor size is determined according to the design requirements, and the thickness of the floor only needs to pass the height of the ribs according to the force. Adjustment;
[0025] 2) The high-strength industrialized bamboo panel in the prefabricated hollow bamboo floor slab shall be made of high-strength indu...
Embodiment
[0033]With reference to the accompanying drawings, the prefabricated hollow bamboo floor slab comprises a high-strength industrialized bamboo panel upper panel 1, a high-strength industrialized bamboo panel lower panel 2, a low-density industrialized bamboo panel rib 3, shear-resistant bamboo pins 4, a high-strength industrialized bamboo panel upper panel 1 and The lower panel 2 is respectively connected with the upper and lower parts of the low-density industrialized bamboo rib 3 through the shear-resistant bamboo pin 4; the thickness of the upper panel 1 of the high-strength industrialized panel and the lower panel 2 of the high-strength industrialized panel is 60mm; the low-density industrialized bamboo rib 3 is 130mm high, 100mm thick, length 3900mm, rib spacing 400mm; shear-resistant bamboo pin 4 is low-density industrial bamboo with a diameter of 15mm and a length of 40mm, and the spacing between bamboo pins is 75mm; the length of the prefabricated hollow floor is 3900mm, ...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 


