Blasting construction method used before construction of mountain shortcuts above existing roads
A construction method and road technology, applied in blasting and other directions, can solve problems such as safety incidents, falling gravel, unsuitable terrain patterns, etc., and achieve the effect of meeting blasting requirements
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0035] In order to make the object, technical solution and advantages of the present invention clearer, the present invention will be further described in detail below in conjunction with the accompanying drawings and specific embodiments. It should be understood that the specific embodiments described here are only used to explain the present invention, and are not intended to limit the present invention.
[0036] The blasting construction method before the construction of the Lama Temple access road in Pengba Township, Luding County, Ganzi Prefecture, Sichuan Province in 2014.
[0037] The access road of the Lama Temple is 8039m long. The construction of the access road of the Lama Temple is winding up the mountain. All the way of the access road is steep cliffs, mainly excavated by stonework, with a vertical height difference of 580m. The road along the way is narrow and there are as many as 16 bends , and the slope is steep and sharp. At the foot of the mountain is the re...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com