Unit type assembly and erection method of extra-high-voltage power transmission iron pylon
A technology for assembling transmission towers and towers, applied in the direction of towers, building types, buildings, etc., can solve the problem of limited inclination of poles, and achieve the effect of improving work efficiency
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Examples
Embodiment Construction
[0014] A kind of unit type assembly method of UHV transmission iron tower of the present invention, comprises the following steps:
[0015] Step 1. Clean up and arrange the construction site, construct the ground foundation, and transport the tower materials required for the erection of the iron tower
[0016] Put it in place; step 2, assemble the pole, erect the pole, and assemble the lower part of the tower leg. The section side width of the assembled pole is 800mm~900mm; when erecting the pole, first connect the four corners of the bottom of the pole to the On the basis, fix the stay wire and the pulley on the top of the pole to ensure that the center of the pole is on the same line as the traction ground anchor; step 3, assemble and erect the tower legs, lift the pole, and lift the components one by one. The binding points of the lifting components should be Set above the center of gravity of the suspended component, located at the symmetrical node between the two main mat...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com