Highway tunnel structure construction method
A technology for road tunnels and construction methods, applied in tunnels, earthwork drilling, mining equipment, etc., can solve the problems of easy damage, poor flexibility of seismic performance, etc.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0027] Embodiment 1: as figure 1 The construction method of the shown highway tunnel structure comprises the following steps:
[0028] (1) Preliminarily construct the structural model of the highway tunnel through computer-aided design, and determine the main components of the structural model of the highway tunnel;
[0029] (2) According to the local seismic fortification intensity, seismic design grouping and site category of the road tunnel structure, construct a random ground motion model of the road tunnel structure model, and generate a power spectral density function corresponding to the displacement and velocity of the main components;
[0030] (3) Calculate the corresponding displacement power spectral density and velocity power spectral density according to the power spectral density function of the displacement and velocity of the main components, and carry out integral calculation on the displacement power spectral density and velocity power spectral density to obt...
Embodiment 2
[0045] Embodiment 2: as figure 1 The construction method of the shown highway tunnel structure comprises the following steps:
[0046] (1) Preliminarily construct the structural model of the highway tunnel through computer-aided design, and determine the main components of the structural model of the highway tunnel;
[0047] (2) According to the local seismic fortification intensity, seismic design grouping and site category of the road tunnel structure, construct a random ground motion model of the road tunnel structure model, and generate a power spectral density function corresponding to the displacement and velocity of the main components;
[0048] (3) Calculate the corresponding displacement power spectral density and velocity power spectral density according to the power spectral density function of the displacement and velocity of the main components, and carry out integral calculation on the displacement power spectral density and velocity power spectral density to obt...
Embodiment 3
[0063] Embodiment 3: as figure 1 The construction method of the shown highway tunnel structure comprises the following steps:
[0064] (1) Preliminarily construct the structural model of the highway tunnel through computer-aided design, and determine the main components of the structural model of the highway tunnel;
[0065] (2) According to the local seismic fortification intensity, seismic design grouping and site category of the road tunnel structure, construct a random ground motion model of the road tunnel structure model, and generate a power spectral density function corresponding to the displacement and velocity of the main components;
[0066] (3) Calculate the corresponding displacement power spectral density and velocity power spectral density according to the power spectral density function of the displacement and velocity of the main components, and carry out integral calculation on the displacement power spectral density and velocity power spectral density to obt...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com