Multi-cavity concrete filled steel tube combination column and steel beam bolt joint and assembly method

A technology of concrete-filled steel tubes and connecting nodes, applied in the direction of construction and building structure, can solve the problems of large welding residual stress, complicated construction, difficult welding, etc., to meet the needs of residential functions, eliminate triaxial stress concentration, and reduce welding. The effect of workload

Active Publication Date: 2016-08-17
西安建大装配式钢结构研究院有限公司
View PDF8 Cites 3 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

Because when the side length is small, it is not only difficult to weld, but also hinders the concrete pouring in the pipe. In addition, the beam flange and the inner partition plate penetrate the weld on both sides of the same column wall, and the steel produces a large welding residual stress, which makes the steel at the joint easy to produce delamination or brittle failure
[0005] (2) Affect the appearance and use of buildings
And when applied to corner columns, the horizontal ring plate not only hinders the installation of wall pa

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Multi-cavity concrete filled steel tube combination column and steel beam bolt joint and assembly method
  • Multi-cavity concrete filled steel tube combination column and steel beam bolt joint and assembly method
  • Multi-cavity concrete filled steel tube combination column and steel beam bolt joint and assembly method

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0034] Below in conjunction with accompanying drawing, the embodiment of the present invention is described in detail: present embodiment implements under the premise of the technical scheme of the present invention, has provided detailed implementation mode and concrete operation process, but protection scope of the present invention is not limited to the following the embodiment.

[0035] see image 3 , the present invention includes steel plates 3 arranged on both sides of the multi-cavity steel pipe concrete composite column, that is, two steel plates are arranged on both sides of the multi-cavity steel pipe concrete composite column, and the top of each steel plate 3 is provided with a first ear plate 5, the first ear plate 5 is connected to the steel plate 3 through the fillet weld, and the steel plate 3 is set on the multi-cavity steel pipe concrete composite column through the weld.

[0036] The upper flange of the steel beam is provided with an upper cover plate 4, t...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention relates to a multi-cavity concrete filled steel tube combination column and steel beam bolt joint and an assembly method. The multi-cavity concrete filled steel tube combination column and steel beam bolt joint comprises steel plates arranged at the two sides of a multi-cavity concrete filled steel tube combination column, and a first ear plate is arranged at the top of each steel plate; an upper cover plate is arranged on the top flange of a steel beam, and a second ear plate is arranged at the bottom of the bottom flange of the steel beam; two connecting angles are arranged at the web plate of the steel beam, and the upper cover plate is connected with the first ear plate; the second ear plate is connected with the steel plate. The joint provided by the invention has high degree of assembly, and the multi-cavity concrete filled steel tube combination column, the steel plates, the steel beam, the upper cover plate, the second ear plate and the connecting angles are prefabricated in the factory, so that the workload of welding of installation is reduced, and the positioning assembly is only needed in on-site installation. The joint is simple in form, quick and convenient to install and has high degree of assembly. Since the traditional penetration welding is avoided during on-site installation, and the greater welding residual stress on steel products is easily generated by the traditional penetration welding, the steel products at the joint are easily laminated or brittlely fractured.

Description

technical field [0001] The invention relates to a structural system of a multi-cavity concrete-filled steel pipe composite column in the technical field of construction engineering, in particular to a connection node and an assembly method of a multi-cavity steel pipe concrete composite column and a steel beam bolt. Background technique [0002] The multi-cavity steel pipe concrete composite column composite structure system is a new type of steel pipe concrete composite column structure system that solves the problem of protruding column feet in residential systems. It has the advantages of high bearing capacity, good plasticity and toughness, and convenient construction. [0003] At present, my country's "Technical Regulations for Rectangular Concrete-filled Steel Tube Structures" (GECS159: 2004) provides steel-beam joints for concrete-filled steel tube composite columns, which mainly include inner diaphragm type and outer ring plate type. But so far, there are the follow...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
IPC IPC(8): E04B1/58E04B1/30
CPCE04B1/30
Inventor 郝际平薛强樊春雷孙晓岭陈永昌刘斌黄育琪王磊尹伟康刘瀚超何梦楠张峻铭赵子健
Owner 西安建大装配式钢结构研究院有限公司
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products