Strengthening method for preliminary tunnel support
An initial support and tunnel technology, applied in the direction of tunnel, tunnel lining, earthwork drilling, etc., can solve the problems of strong operability, tunnel collapse, large tunnel excavation section, etc., to achieve strong operability and ensure safety. , The effect of saving engineering investment
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0022] The present invention will be further described below in conjunction with accompanying drawing.
[0023] like figure 1 , figure 2 Shown, the reinforcement method of tunnel primary support of the present invention comprises the following steps:
[0024] a. Use the slag 1 to quickly perform back pressure treatment on both sides of the bottom of the initial support 2;
[0025] b. Set up a support device 4 on the inner side of the initial support 2 for temporary support processing;
[0026] c. Carry out radial reinforcement treatment to the surrounding rock within the scope of the arch wall of the tunnel 3 in the primary support 2 deformation section;
[0027] d. Carry out secondary concrete lining construction for primary support 2.
[0028] In step a, use slag 1 to quickly perform backpressure treatment on both sides of the bottom of primary support 2. In the initial stage of tunnel construction, slag 2 is used as waste, and slag 1 is used to perform backpressure on ...