A multi-coal seam capsule isolation layer fracturing device and method
A layered fracturing and multi-coal seam technology, which is applied in earthwork drilling, sealing/isolation, wellbore/well components, etc., can solve the problem of complex hole sealing structure of the sealing device, long sealing and fracturing time, coal seam High anti-permeability cost and other problems, to achieve good anti-permeability effect of coal seam, low cementing cost and good sealing effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0024] Example 1, see figure 1 , a multi-coal seam capsule isolation layered fracturing device, including a casing 2 arranged in an open hole 1, both the open hole 1 and the casing 2 pass through a plurality of coal seams 3, and the casing 2 is formed with a plurality of Flower pipe sections 2a corresponding to the positions of multiple coal seams 3; multiple bladders 4 are set on the casing 2, and the bladders 4 are used to form a bladder cementing structure between the casing 2 and the rock formations 5 on both sides of the coal seam 3, and the adjacent bladders The bags 4 are connected through the connecting pipe 6, and one of the multiple bladders 4 is connected to the grouting system through the grouting pipe 10; the casing 2 is movable with a capsule sealing and fracturing device with an integrated structure, The capsule hole-sealing fracturing device is connected with the fracturing pump group to perform hydraulic fracturing on the coal seam 3 layer by layer, and before...
Embodiment 2
[0026] Example 2, see figure 1 , a multi-coal seam capsule isolation layer fracturing method, which is carried out by applying the multi-coal seam capsule isolation layer fracturing described in Embodiment 1, comprising forming an open hole 1 through a plurality of coal seams 3 through a rock layer 5 and a coal seam 3, the The method also includes the following steps,
[0027] In the first step, a casing 2 having a plurality of flower tube sections 2a is placed into the bare hole 1, and the flower tube sections 2a are located in the corresponding target coal seam 3;
[0028] In the second step, through the grouting method and the grouting tube 10, according to the order from the pouch 4 at the far end of the bare hole 1 to the pouch 4 at the proximal end, grouting is sequentially grouted into a plurality of pouches 4, so that the sleeve pipe 2 and A multi-stage pocket cementing structure is formed between multiple rock formations 5, and the grouting is stopped after the grout...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More - R&D
- Intellectual Property
- Life Sciences
- Materials
- Tech Scout
- Unparalleled Data Quality
- Higher Quality Content
- 60% Fewer Hallucinations
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2025 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com

