Eureka AIR delivers breakthrough ideas for toughest innovation challenges, trusted by R&D personnel around the world.

Building design management system based on BIM and VR and management method thereof

A technology for architectural design and management systems, applied in computing, data processing applications, instruments, etc., can solve problems such as low efficiency, increased work difficulty, and design results that are not three-dimensional and obvious, so as to reduce the trouble of design delays and improve communication The effect of efficiency and accuracy

Active Publication Date: 2016-11-16
XIAMEN RUICHUANG ENERGY SAVING TECH CO LTD
View PDF5 Cites 16 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0003] As a revolutionary upgrade of architectural graphic visualization from plane to three-dimensional, BIM has become a key technology in the field of architectural engineering. However, there are still some difficulties in applying BIM to architectural design: first, the BIM model needs to be designed according to customer needs. It is to provide the drawing to the customer, and the customer will propose amendments after viewing. This process is often inefficient, because it is difficult to unify the customer's needs and the thinking of the design team, and the design results of the drawing are not three-dimensional and obvious. Manual file delivery and other processes with uncertain factors, for designers, it is more difficult to modify the BIM model repeatedly

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Building design management system based on BIM and VR and management method thereof

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0020] like figure 1 As shown, a BIM and VR-based architectural design management system disclosed by the present invention includes:

[0021] The BIM center server 1 stores the BIM model, including the parameters corresponding to the model, the visual data corresponding to the model, and the replacement parts library corresponding to the model components; it is used for the VR interactive display device to retrieve the visual data corresponding to the model, and receive VR The modified visual lightweight data corresponding to the model returned by the interactive display device, and the modified visual lightweight data corresponding to the model is sent to the professional design platform;

[0022] Professional design platform 2 is connected to the BIM center server, and receives the modified visual lightweight data corresponding to the model sent by the BIM center server. Modify the BIM model, and return the modified BIM model to the BIM center server to update the original...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses a building design management system based on BIM and VR and a management method thereof. The design effect of a designed BIM model is presented on a client in the form of virtual reality. If a customer needs to modify the design, satisfactory parts are directly selected in a replacement part library to perform replacement modification of the original design, without the need of providing modification suggestions by way of human description, thereby reducing the trouble of design delay which may be caused due to ineffective communication. The modification intention of the customer is finally returned to designers in the form of modified visualization lightweight data corresponding to the model. The designers can visually understand the modification intention of the customer, modify the BIM model which is originally stored in a BIM central server according to the modification suggestions, and finally return the modified BIM model to the BIM central server to update the original BIM model. In this way, the way of oral communication between professionals and non-professionals is changed and interactive presentation of the communication intentions is conducted in a manner of visualization, thereby improving the communication efficiency and accuracy.

Description

technical field [0001] The invention relates to the technical field of architectural design, in particular to a BIM and VR-based architectural design management system and a management method thereof. Background technique [0002] Building Information Modeling BIM (Building Information Modeling) takes the relevant information data of the construction project as the basis of the model, establishes the building model, and simulates the real information of the building through digital information simulation. It has five characteristics of visualization, coordination, simulation, optimization and drawing. [0003] As a revolutionary upgrade of architectural graphics visualization from plane to three-dimensional, BIM has become a key technology in the field of architectural engineering. However, there are still some difficulties in applying BIM to architectural design: First, the BIM model needs to be designed according to customer needs. It is the drawing that is provided to th...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
IPC IPC(8): G06Q10/10G06Q50/08
CPCG06Q10/101G06Q50/08
Inventor 张壮飞
Owner XIAMEN RUICHUANG ENERGY SAVING TECH CO LTD
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Eureka Blog
Learn More
PatSnap group products