Pile-side grouting device for offshore large-diameter steel pipe pile and construction method of pile-side grouting device

A technology of grouting device and steel pipe pile, which is applied in the direction of infrastructure engineering, construction, etc., can solve the problems of easily broken particles, high engineering cost, and reduced bearing capacity, and achieve the goals of simple material selection, saving engineering progress, and improving bearing capacity Effect

Active Publication Date: 2016-12-14
SOUTHEAST UNIV
View PDF5 Cites 9 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

However, the particles of bored piles and steel pipe piles driven into coral reef geology are easily broken, which reduces the bearing capacity. Therefore, it is necessary to use post-grouting technology to improve the bearing capacity of foundation piles in coral ree

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Pile-side grouting device for offshore large-diameter steel pipe pile and construction method of pile-side grouting device
  • Pile-side grouting device for offshore large-diameter steel pipe pile and construction method of pile-side grouting device
  • Pile-side grouting device for offshore large-diameter steel pipe pile and construction method of pile-side grouting device

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0037] The technical solution of the present invention will be further described below in conjunction with the accompanying drawings.

[0038] Such as figure 1 and figure 2 As shown, a large-diameter offshore steel pipe pile side grouting device of the present invention includes a pipe pile 1 and a grouting pipe 2, and a plurality of symmetrically distributed grouting pipes 2 are fixed on the inner wall of the pipe pile 1 to form a group of grouting pipe groups , the number of each grouting pipe group is 4 to 8, and the grouting pipe 2 generally adopts a high-pressure grouting hose. The upper end of the grouting pipe 2 is externally connected to the grouting platform, and the grouting platform is generally other grouting equipment such as a grouting pump. The lower end of the grouting pipe 2 is connected with an elbow 3, which is a buckle-type joint, and the elbow 3 should ensure the length inserted into the grouting pipe, and be fastened with iron wire to prevent leakage. ...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention discloses a pile-side grouting device for an offshore large-diameter steel pipe pile. The pile-side grouting device comprises the pipe pile and grouting pipes fixed to the inner wall of the pipe pile. The upper ends of the grouting pipes are externally connected with a grouting platform. The lower ends of the grouting pipes are connected with grouting holes formed in the walls of the pipe pile, and the grouting holes are movably sealed. By the adoption of the pile-side grouting device for the offshore large-diameter steel pipe pile, a gap between the outer wall of the steel pipe pile and the surrounding coral reef layer can be filled with concrete effectively, and the effects that the bearing capacity of the steel pipe pile is improved, the settlement of the foundation pile is reduced and the cost is reduced are achieved. The pile-side grouting device for the steel pipe pile is affordable, suitable for being mounted at a construction site and convenient to apply and popularize, raw materials can be obtained easily, and the pile-side grouting device can be mounted and used by professionals at the construction site simultaneously with piling, the progress of a project can be saved effectively, and thus the pile-side grouting device is convenient to use and popularize.

Description

technical field [0001] The invention relates to a pipe pile and a construction method in the field of civil engineering, in particular to a side grouting device for a large-diameter steel pipe pile at sea and a construction method thereof. Background technique [0002] With the development of my country's economy, the demand for energy is increasing. Due to the rich natural resources in the South China Sea, they have high development value, and almost all islands and reefs in the South China Sea are composed of coral reefs. The traditional bored pile foundation has a long construction period and a large amount of grouting, resulting in high cost. In order to ensure the stability of the borehole, support measures need to be taken to ensure construction safety; the grouting amount of the bored pile is large, and after consolidation Large shrinkage occurs, and cracks are prone to occur, resulting in a decrease in bearing capacity. Compared with bored piles, steel pipe piles ha...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
IPC IPC(8): E02D15/04
CPCE02D15/04E02D2250/0061
Inventor 龚维明戴国亮万志辉邓会元
Owner SOUTHEAST UNIV
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products