Multi-bit Pre-control Electromagnetic Thunder Interference Method of Building Intelligent System
An intelligent system, wave interference technology, applied in the parts of the instrument, shielding, instruments, etc., can solve the problems of easy damage, threats to people's life and property safety, etc., and achieve the effect of convenient construction and excellent working performance
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Examples
Embodiment 1
[0049] A method for multi-position pre-control electromagnetic thunder wave interference of building intelligent system, comprising the following steps:
[0050] (1) Body shielding
[0051] Reinforcement selection: Select resistivity ≤ 0.97×10 -7 Ωm, steel bars with a carbon content of 0.25-0.45%, the specifications are φ≥3mm steel bars;
[0052] Reinforcement welding: connected by welding method, and the welding is full;
[0053] Reinforcement layout: vertically weld the selected reinforcement on the internal reinforcement grid where the building object must be originally located, and set the outer grid connection points at a distance of 2m, and set 2-3 internal electrical and electronic intelligent equipment connection points on each floor ;
[0054] When the connection point is formed, the internal connection point can be connected to the electrical and electronic smart devices in the building;
[0055] After the roof and wall matrix is formed, cover the outer body wi...
Embodiment 2
[0091] A method for multi-position pre-control electromagnetic thunder wave interference of building intelligent system, comprising the following steps:
[0092] (1) Body shielding
[0093] Reinforcement selection: select resistivity ≤ 0.97×10 -7 Ωm, steel bars with a carbon content of 0.25-0.45%, the specifications are φ≥3mm steel bars;
[0094] Reinforcement welding: connected by welding method, and the welding is full;
[0095] Reinforcement layout: vertically weld the selected reinforcement on the internal reinforcement grid where the building object must be originally located, and set the outer grid connection points at a distance of 2m, and set 2-3 internal electrical and electronic intelligent equipment connection points on each floor ;
[0096] When the connection point is formed, the internal connection point can be connected to the electrical and electronic smart devices in the building;
[0097] After the roof and wall matrix is formed, cover the outer body wi...