Long screw extrusion-socketed cast-in-place pile construction method based on circulating slurry breast wall

A technology of mud wall protection and construction method, which is applied in infrastructure engineering, drilling equipment and methods, sheet pile walls, etc., can solve the problems of difficult to guarantee the quality of the pile body, uncontrollable construction quality, and low bearing capacity of single piles.

Active Publication Date: 2017-01-04
SHAANXI ZHUANGXIN CONSTR ENG +4
View PDF6 Cites 24 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

But there are following defects and deficiencies in the existing common long spiral hole-forming cast-in-place piles: first, the scope of application is limited, and can only be applied in soil layers such as cohesive soil, silt, and filling soil; When the diameter pebble layer, then drilling is difficult or can't be drilled; Therefore, the soil layer adaptability of existing long spiral hole-forming cast-in-place pile is insufficient, and some areas cannot be adopted; Second, the existing long spiral hole-forming pile cannot enter the rock , so the pile end cannot be placed in the soil layer with high bearing capacity after the pile is formed, resulting in practical problems such as low bearing capacity of the single pile; third, after the existing long spiral hole-forming cast-in-situ pile is formed, the soil at the pile end is disturbed, which is easy Form void soil at the bottom of the hole, reduce the resistance of the pile end, thereby affecting the bearing capacity of the single pile; fourth, the quality of the pile body is difficult to guarantee: after the existing long spiral hole-forming cast-in-place pile is holed, when the drill pipe is lifted while pouring, the lifting speed must be Adapt to the pumping speed, and keep more than 0.1 cubic meters of material in the drill pipe, so as to ensure continuous pressure discharge of the drill pipe outlet, otherwise it is easy to cause bad pouring phenomena such as pile breakage, diameter shrinkage, and mud inclusion. Affect the quality of the pile body; Fifth, it is difficult to guarantee the pouring quality: in the construction process of the existing long spiral hole-forming cast-in-place piles, most of them rely on manual observation of the shrinkage and expansion of the concrete delivery pipe and the discharge of the drill pipe vent hole, and according to the observation As a result, the

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Long screw extrusion-socketed cast-in-place pile construction method based on circulating slurry breast wall
  • Long screw extrusion-socketed cast-in-place pile construction method based on circulating slurry breast wall
  • Long screw extrusion-socketed cast-in-place pile construction method based on circulating slurry breast wall

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0098] Such as figure 1 A construction method of long spiral extruded cast-in-place piles based on circulating mud retaining wall shown, including the following steps:

[0099] Step 1. Casing embedding and mud circulation system setting: measure and set out the pile position of the constructed long screw extruded cast-in-place pile, and bury the casing on the pile position obtained by measuring and setting out; at the same time, in the Set up a mud circulation system around the pile position of the long screw extruded cast-in-place pile;

[0100] The mud circulation system includes a slurry storage tank for storing wall mud and a mud pumping device for pumping the mud; the upper part of the casing exposed to the ground is an exposed segment, and the exposed segment There are a plurality of overflow holes for the overflow of the retaining wall mud;

[0101] Step 2. Drilling to form a hole: Utilize the casing buried in step 1, and use a long screw pile driver to drill down, an...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

PropertyMeasurementUnit
Heightaaaaaaaaaa
Heightaaaaaaaaaa
Lengthaaaaaaaaaa
Login to view more

Abstract

The invention discloses a long screw extrusion-socketed cast-in-place pile construction method based on circulating slurry breast wall, comprising the steps of first, burying a protective barrel and setting a slurry circulating system that comprises a slurry storage tank and a slurry pumping device, with the upper portion of the protective barrel provided with an overflow hole; second, drilling to form a borehole; third, lifting a drill pipe, and casting a slurry breast wall under high pressure: lifting up the drill pipe, and continuously casting wall supporting slurry from bottom to top from the borehole bottom through the drill pipe by using the slurry pumping device; fourth, lowering a reinforcement cage; fifth, casting concrete underwater and recycling the wall supporting slurry, and recycling the wall supporting slurry discharged through the overflow hole to the slurry storage tank for backup. The method has simple steps, is easy to implement, has high hole-forming quality and good construction effect, and enables the construction of a long screw extrusion-socketed cast-in-place pile to be finished simply and quickly, and by casting the wall supporting slurry from bottom to top from the borehole bottom in a high-pressure casting manner, it is possible to effectively protect the wall and keep the borehole bottom clean with no deposit; the wall supporting slurry is reusable.

Description

technical field [0001] The invention belongs to the technical field of foundation construction, and in particular relates to a construction method of a long spiral extruded cast-in-place pile based on circulating mud retaining walls. Background technique [0002] At present, in foundation projects such as construction, water conservancy, and highways, long spiral hole-forming cast-in-situ piles are widely used due to their advantages of high speed, low noise, no need for mud retaining walls, and low construction costs. But there are following defects and deficiencies in the existing common long spiral hole-forming cast-in-place piles: first, the scope of application is limited, and can only be applied in soil layers such as cohesive soil, silt, and filling soil; When the diameter pebble layer, then drilling is difficult or can't be drilled; Therefore, the soil layer adaptability of existing long spiral hole-forming cast-in-place pile is insufficient, and some areas cannot be...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
IPC IPC(8): E02D5/38E02D15/04E02D5/66E02D5/22E21B7/00
CPCE02D5/223E02D5/38E02D5/665E02D15/04E21B7/00
Inventor 庄金敖文庄春
Owner SHAANXI ZHUANGXIN CONSTR ENG
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products