Quick construction technology for pre-buried bolt group of ore dumping pit curved-track foundation
A technology of pre-embedded bolts and construction technology, which is applied in basic structural engineering, architecture, building construction, etc., can solve the problems of low precision, long construction period and manpower, and large errors, and achieves high precision, low labor consumption, Ease of construction
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Examples
Embodiment
[0015] A rapid construction technology for pre-embedded bolt groups in curved rail foundations of unloading pits, characterized in that it includes the following steps:
[0016] Step 1), pre-embedded component processing. Select several channel steels, and the channel steels should be straight without bending; determine the length of the channel steels according to the number of bolts in each row or column, mark the length on the entire channel steels with a stone pen, and number the channel steels; then carry out Cutting, the cutting surface must be neat; after the channel steel is cut, mark the bolt hole position on the channel steel according to the design position of the bolt corresponding to the numbered channel steel, and use a drill to drill the hole at the marked position, and the hole diameter is 2mm larger than the bolt diameter ; After the hole is drilled, the channel steel is welded into a whole according to the number, and the bolt design position is verified.
...