Method for building aluminum house
A construction method and a technology for cement ground piles are applied in the construction field of aluminum houses, which can solve the problems of limited wind resistance and earthquake resistance, unsatisfactory and insufficient resistance to horizontal force, and achieve good thermal insulation effect.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0078] Embodiment 1: An aluminum house, including a base 1, an aluminum alloy frame 2 built on the basis of the base 1 and a wall 3 connected in the framework of the aluminum alloy frame 2, the base 1 includes a partially buried The support part 11 distributed at intervals between the underground cement piles 111, the integrated frame 12 composed of several reinforcing beams 121 connecting the two cement piles 111, and the vertical and horizontal gaps between the integrated frames 12 The pressure-bearing grid 13 formed by the pressure-bearing beams 131.
[0079] The interval between the adjacent cement ground piles 111 is 3-8 meters; the reinforcing beam 121 is a steel bar, and the steel bars are sequentially connected to the cement ground piles 111 on the periphery of the base 1 to form a ring-shaped outer frame. , the steel bars connect the cement piles 111 on the periphery of the base 1 with the cement piles 111 in the middle of the base 1 to form a network-like integrated ...
Embodiment 2
[0082] Embodiment 2: An aluminum house, including a base 1, an aluminum alloy frame 2 built on the basis of the base 1, and a wall 3 connected in the framework of the aluminum alloy frame 2, the base 1 includes a partially buried The support part 11 distributed at intervals between the underground cement piles 111, the integrated frame 12 composed of several reinforcing beams 121 connecting the two cement piles 111, and the vertical and horizontal gaps between the integrated frames 12 The pressure-bearing grid 13 formed by the pressure-bearing beams 131.
[0083]The interval between the adjacent cement ground piles 111 is 3-8 meters; the reinforcing beam 121 is a steel bar, and the steel bars are sequentially connected to the cement ground piles 111 on the periphery of the base 1 to form a ring-shaped outer frame. , the steel bars connect the cement piles 111 on the periphery of the base 1 with the cement piles 111 in the middle of the base 1 to form a network-like integrated ...
Embodiment 3
[0087] Embodiment 3: An aluminum house, including a base 1, an aluminum alloy frame 2 built on the basis of the base 1 and a wall 3 connected in the framework of the aluminum alloy frame 2, the base 1 includes a partially buried The support part 11 distributed at intervals between the underground cement piles 111, the integrated frame 12 composed of several reinforcing beams 121 connecting the two cement piles 111, and the vertical and horizontal gaps between the integrated frames 12 The pressure-bearing grid 13 formed by the pressure-bearing beams 131.
[0088] The interval between the adjacent cement ground piles 111 is 3-8 meters, and the cement ground piles 111 on the periphery of the support portion 11 form a regular polygon; the reinforcing beam 121 is a steel bar, and the steel bars are connected to the The cement ground piles 111 on the periphery of the base 1 form a ring-shaped outer frame. On this basis, the steel bars connect the cement ground piles 111 on the perip...