A Mixed Construction Method of Radiant and Stepped Small Patios with Tall and Large Chambers
A construction method and stepped technology, applied in underground chambers, mining equipment, earthwork drilling and mining, etc., can solve problems such as increased safety hazards, large section size, and low quality chambers
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0017] Hereinafter, a mixed construction method of radial and stepped construction methods for tall and large chambers of the present invention will be described in detail.
[0018] The specific idea of the mixed construction method of radiation type and step type in a kind of tall and large chamber of the present invention is to first use the anti-patio method to excavate the small patio group 2 to the preset height, starting from the first small patio 3, the construction personnel stand On the rock drilling work platform 9 of the first small patio 3, blast holes are drilled obliquely upwards on the sides of the first small patio 3 at a slope angle of 35° to 45° and blasted so that the first small patio 3 and the chamber 1 are connected to the outside. Form the first radial conical well 10; then use the above method to sequentially expand the second small patio 4, the third small patio 5, and the fourth small patio 6 upwards and penetrate to form a radial conical well group ...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 


