Ultrahigh-voltage direct-current transmission project converter transformer alternating-current loop system on-site inspection method

A technology of DC transmission and AC loop, which is applied in the direction of measuring electrical variables, measuring electricity, transformer testing, etc., and can solve problems such as difficult to find AC loop open circuit, equipment damage to the system, and complicated wiring

Inactive Publication Date: 2017-01-11
云南送变电工程有限公司
View PDF2 Cites 5 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

One-time installation and wiring is complicated, and its correctness lacks effective verification
[0006] Based on the core position and importance of the converter transformer in the HVDC transmission system, coupled with the complexity of the primary and secondary installation and wiring of the AC loop system, only according to the existing technology and based on personal experience, through the loop

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Ultrahigh-voltage direct-current transmission project converter transformer alternating-current loop system on-site inspection method
  • Ultrahigh-voltage direct-current transmission project converter transformer alternating-current loop system on-site inspection method
  • Ultrahigh-voltage direct-current transmission project converter transformer alternating-current loop system on-site inspection method

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0028] The on-site inspection method of the converter transformer AC loop system of the ultra-high voltage direct current transmission project in the present invention is carried out on the converter transformer that has completed the installation and handover test. The drain line of the converter transformer is connected to the AC transformer T for testing, and the test voltage is applied on the AC network side of the converter transformer through the AC transformer T, and the Y / Y converter and Y / △ converter valve side windings are respectively grounded. , by detecting the amplitude and phase of the primary test current, primary test voltage, secondary current, and secondary voltage, it is judged whether there is a circuit defect from the primary wiring of the converter transformer to the secondary circuit. Test equivalent circuits such as figure 1 shown. figure 1 Middle Z T is the short-circuit impedance of the converter, U T The test voltage applied to the test transform...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

Disclosed is an ultrahigh-voltage direct-current (DC) transmission project converter transformer alternating-current (AC) loop system on-site inspection method. The method is implemented on a converter transformer after installation and commissioning test, and a converter valve is installed and is always in a locked state. An AC 500kV GIS is removed temporarily to a drainage line of the converter transformer, a test converter transformer T is connected, a test voltage is applied to the AC network side of the converter transformer through the converter transformer T, the valve-side windings of a Y/Y converter transformer and a Y/Delta converter transformer are grounded, and whether there is a loop defect from the primary wiring to the secondary loop of the converter transformer is judged by detecting the amplitudes and phases of the primary test current, primary test voltage, secondary current and secondary voltage. The design, construction and commissioning quality of a converter transformer AC loop system can be detected comprehensively, and the level of safe and stable operation of DC transmission can be improved.

Description

technical field [0001] The invention relates to the technical field of ultra-high voltage direct current transmission. Background technique [0002] In the ultra-high voltage direct current transmission system, the converter transformer and the converter valve together realize the mutual conversion between alternating current and direct current, which is the core equipment in the ultra-high voltage direct current transmission system. The basis for the safe and stable operation of the DC transmission system, the correctness of the design and construction of the AC circuit will directly determine the stability and safety of the DC transmission. [0003] First of all, the converter transformer is located at the core of the mutual conversion of AC and DC voltages. There are not only the first bushing and the last bushing, but also the star-shaped connection head bushing and the end bushing on the valve side, and the angular connection first bushing on the valve side. End bushin...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
IPC IPC(8): G01R31/00G01R31/02
CPCG01R31/00G01R31/62
Inventor 果家礼叶林平李玉玺杨海滨魏忠明高德清杨猛陈旻张万成高东李俊峰
Owner 云南送变电工程有限公司
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products