136results about How to "Improve the level of safe and stable operation" patented technology

Distribution network intelligent alarm and processing method based on integrated allocation

The invention discloses a distribution network intelligent alarm and processing method based on integrated allocation. The method comprises the following steps: a distribution network reads main network information; models are merged and reconstructed to match flow; alarm information is integrated; an alarm model is constructed; safety assessment and intelligent analysis are conducted; comprehensive intelligent alarm is generated; and auxiliary recovery control decisions are automatically made. The method employs comprehensive safety state estimation technology, intelligent fault alarm technology, auxiliary decision making technology and the like, finds fault information of the distribution network automatically in real time, merges, analyzes and processes alarm information effectively, and instructs related persons of the distribution network to make correct decisions to ensure safe and reliable operation of the distribution network.
Owner:STATE GRID ZHEJIANG ELECTRIC POWER CO LTD SHAOXING POWER SUPPLY CO +3

Method and system for detecting distribution network automatic terminal

ActiveCN102879661AFunctional specificationPerformance specificationElectrical testingComputer scienceDistribution networks
The invention discloses a system and a method for detecting a distribution network automatic terminal. The system comprises a program control power supply, a standard meter and a detection device, wherein the program control power supply is used for supplying power and providing a test signal which comprises test voltage and test current to a detected terminal according to a signal command which is externally input; the standard meter is used for displaying the test signal which is generated by the program control power supply; and the detection device is used for sending the signal command to the program control power supply or the detected terminal, generating a detection result in response to the signal command according to the detected terminal, and storing the detection result. Functions, the accuracy and a communication protocol of the distribution network automatic terminal can be integrally detected. The invention is widely applicable to establishment of a distribution network automatic system, the performance and functions of the distribution network automatic terminal can be standardized, product quality is improved, the potential safety hazard of the distribution network automatic system can be effectively reduced, the level of safe and stable operation of a power distribution network is improved, the reliability of a power distribution system is improved, and solid foundation is laid for promotion of the establishment and application of a power distribution automatic system.
Owner:NORTH CHINA ELECTRICAL POWER RES INST +1

Electric power system transient state stable real-time emergency control method based on relative kinetic energy

The invention discloses an electric power system transient state stable real-time emergency control method based on relative kinetic energy. By means of the method of judging rotative speed difference-power angle difference variation tendency, the transient state stability of the system is monitored in real time to serve as a start-up condition of emergency control. When the fact that the system loses the power angle stability is judged, a remaining accelerating area is calculated based on the relative kinetic energy in a two-machine system, and a generator tripping value is calculated and controlled through the equal-area criterion. During the control decision process, the action delay time is taken into consideration, and the calculation results are enabled to be more reliable. The electric power system transient state stable real-time emergency control method based on the relative kinetic energy overcomes the defects that when an offline calculation is conducted, operation modes and obstructions need to be anticipated, and the flexibility is insufficient when a small probability accident is handled, and can be complementary to a security and stability control system, a new defense line is built to prevent the system from deteriorating further even causing a big blackout accident, the power grid safety and stability defense system is enriched, and the safety and stability operation level of the electric power system is improved.
Owner:CHINA ELECTRIC POWER RES INST +1

Method of forming distributed energy storage system by small hydropower cluster

The invention discloses a method of forming a distributed energy storage system by a small hydropower cluster. The method comprises steps: a total net load value PLj(t) of all small hydropower stations at a tth time in an energy storage cycle T is acquired; according to an optimization objective, the total net load value PLj(t) and planned load pi(t) of an ith small hydropower station, the actual load pfci(t) of the ith small hydropower station is acquired; and according to the actual load pfci(t) of the ith small hydropower station, optimal efficiency control is carried out on a water pumping and water storing device of the ith small hydropower station, and the ith small hydropower station is made to operate under the optimal efficiency according to the actual load pfci(t), wherein the water pumping and water storing device is a hydraulic turbine, a water pump or a reversible hydraulic turbine. Through carrying out improvement on the small hydropower stations and using an energy management unit to manage the small hydropower stations in a unified mode, the multiple small hydropower stations can form a large energy storage system capable of power generation and energy storage, the problems of the operation efficiency and the utilization of the small hydropower stations can be solved, and the regulation capability of the power grid is improved.
Owner:HUAZHONG UNIV OF SCI & TECH

Electric-power system transmitting-line fault diagnosis and phase selecting method

The method includes following steps: collecting data in order to obtain signals of voltage and current at multiple ends of tested wires; recording and exchanging electrical data before and after fault in order to obtain needed data to locate position of fault; distinguishing defective phase. Comparing with prior art, the invented method solves issue existed for long time: distinguishing between fault and oscillation correctly; determining defective phase; discriminating whether fault happened within section or out of section. Thus, the invention raises level of running electric power system safely and stably.
Owner:WUHAN UNIV

A method and system for trade inter-provincial peak shaving auxiliary service

The invention discloses an inter-provincial peak shaving auxiliary service transaction method and system. The method comprises the following steps: receiving provincial and municipal tie line outlet pre-power generation plan and preparing provincial and municipal pre-power generation plan, including determining the peak shaving demand of each provincial and municipal next day or the peak shaving margin of each provincial and municipal regulating unit; declaring the peak-shaving demand of each province or municipality or the peak-shaving margin of each provincial or municipal pipe-regulating unit on the next day; Releasing the demand of each province and city for peak shaving on the next day; Receiving the peak-shaving capacity and peak-shaving price declared by the power plant with peak-shaving margin on the next day and clearing the peak-shaving market according to the peak-shaving demand of each province and city on the next day; Purchasing peak shaving auxiliary service provincial and municipal clearing power, sellling peak shaving auxiliary service management unit clearing power for peak shaving cost allocation and settlement according to the clearing price in each period. Theinvention encourages power generation enterprises to actively participate in peak shaving auxiliary service by economic means, improves the peak shaving capacity of the unit, releases peak shaving resources, alleviates the peak shaving difficulty of the power network, and improves the new energy consumption capacity among provinces.
Owner:NARI TECH CO LTD +4

Stable, real-time and emergent voltage and power angle control method based on response message

The invention provides a stable, real-time and emergent voltage and power angle control method based on a response message. The method comprises steps as follows: step 1, a power angle quantity and a rotation speed quantity of an electric generator in an electrical power system as well as voltage and current amount of an important load bus of a receiving system are acquired in real time; step 2, power angle stability and voltage stability of the system are monitored in parallel simultaneously, the step 3 is executed when the system loses the power angle stability, the step 4 is executed when the system loses voltage stability, and the step 1 is executed when the system is stable; step 3, a retardation area Sc which should be increased to the system is calculated by utilizing a fit power characteristic curve, a generator-shedding measurement amount is determined, and the step 1 is executed; and step 4, the bus voltage amplitude is used as an evidence for judging the severity of voltage instability, the bus load shedding amount is determined according to the difference of the severity of voltage instability, and the step 1 is executed. The provided real-time and emergency control method adopts a parallel judgment manner, so that a stable, real-time and emergency control scheme of voltage and the power angle of an electrical power system is constructed.
Owner:STATE GRID CORP OF CHINA +1

Safe method for entering tangent tower equal potentials for live-wire operation in 660kV direct current lines

The invention provides a safe method for entering tangent tower equal potentials for live-wire operation in 660kV direct current lines. First, an operator, wearing complete shielding clothing, climbs a tower from the ground to the position where a tower body and a conducting wire are at the same level. During the climbing process, the operator keeps a distance of 4.5-7.0 meters from an electrified body; second, the operator arrives at a high electric field from the towel body by an insulating carrier and the sum of the distance between a grounding body and the operator and the distance between the operator and the electrified body is kept between 4.6 meters and 7.0 meters; and the operator, when arriving at the electrified body, keeps a distance of 4.5-7.0 meters from the grounding body. The safe method can provide high safety for operators during the process of entering the tangent tower equal potentials in the 660kV direct current transmission lines for live-wire operation which therefore can be safely and conveniently conducted so as to improve the safe and stable operation level of the transmission lines.
Owner:STATE GRID ELECTRIC POWER RES INST

Transient stabilization control method for interconnection electrical network after impact disturbance

The invention provides a transient stabilization control method for an interconnection electrical network after impact disturbance. The method comprises: based on the transient energy function of the electrical network after the impact disturbance, establishing, according to the energy propagation characteristic of the power fluctuation of a junctor, a junctor cut set potential energy function; through a junctor cut set potential energy curve and the angular phase difference of the busbars at the two ends of the junctor, predicting the angular phase stability of the interconnection electrical network; and calculating the power for removing a unit when there is power angle instability. The method provided by the invention can be applied to the theoretically and simulation analysis of an electric power system. By using the method, the propagation characteristics of transient energy in the electrical network after the impact disturbance can be mastered, the stability of the interconnection electrical network can be predicted, and a controlled variable for maintaining stability can be calculated, thus effective measures can be taken by analysis personnel, and the safe and stable operation level of the electric power system can be improved.
Owner:STATE GRID CORP OF CHINA +1

Equipotential access method of 500kV same-tower four-circuit transmission line tangent tower live-wire work

The invention provides an equipotential access method of a 500kV same-tower four-circuit transmission line tangent tower live-wire work which can safely access into an outside 6-phase wire by adopting a sliding rail-centipede-type ladder-hanging seat method or a flexible ladder method. The sliding rail-centipede-type ladder-hanging seat method is characterized in that beside the outside wire, one end of an insulated centipede-type ladder is connected with a hanging seat, the other end of the insulated centipede-type ladder is connected with a sliding rail, the sliding rail is arranged at the upper end of the outside wire near the tail end of a cross arm; and the flexible ladder method is characterized in that the insulated flexible ladder is hung at the tail end of the cross arm, and a pulley provided with an insulated control rope is arranged in the middle of the cross arm. The two methods can both ensure that the equipotential access operation of the 500kV same-tower four-circuit transmission line tangent tower live-wire work is finished safely and smoothly.
Owner:STATE GRID ELECTRIC POWER RES INST

Method for evaluating new energy acceptance capacity of grid-connected point by comprehensively considering stability characteristic

The invention discloses a method for evaluating the new energy acceptance capacity of a grid-connected point by comprehensively considering the stability characteristic, and belongs to the technical field of automation of power systems. The influences of wind power generation variability and instability on a power grid, an external load level and the change condition thereof are combined; a multi-machine system is equivalent to a single-machine infinite bus system through an EEAC method by employing a static stability constraint, reactive power control and a transient constraint of the power system as conditions; the stability margin and the sampling yield are calculated; and the capability of connecting a wind power station of considering a transient stability constraint to the power grid to the maximum extent is evaluated by employing the specified range of the sampling yield as an index. By the method, the safe and stable operation level of the wind power station can be improved; the generating capacity of the wind power station is effectively ensured; and the benefits of energy conservation and emission reduction are improved.
Owner:NARI TECH CO LTD +3

Method for classifying and realizing integral alarm facing to dispatching running way

The invention discloses a method for classifying and realizing integral alarm facing to a dispatching running way, belonging to the technical field of intelligent analysis and control on power systems. The method is characterized by comprising the following steps: receiving various alarm information of a power grid in real time; and extracting, analyzing and integrating the information from the aspect of dispatching running so as to establish a 'system-application-element' graded and layered alarm framework, wherein the system layer represents the whole running state of the power grid; the application layer represents the running state of the power grid in certain features; and the element layer represents the running state of some equipment of the power grid. The method in the invention,when the alarm exists, dispatchers are enabled to comprehensively handle the whole running state of the power grid, and rapidly inquire the specific information of the power grid so as to realize highly integrate macroscopic views and details. By utilizing the method provided by the invention, the work efficiency of the dispatchers is improved; the running pressure is reduced; and the safe running level of the power grid is improved.
Owner:NARI TECH CO LTD +1

Method for power network splitting and load shedding

The invention relates to a method for power network splitting and load shedding. The method is characterized by the following splitting: low slip frequency splitting, high slip frequency splitting, low frequency overload splitting and splittings for alternative directions or ground fault. In addition, the splitting with a multi-round load shedding is carried out according to the received electrical power. The method of the invention can be employed to improve level of safe and stable operation of a self-propelled power system and a main network power system.
Owner:CHINA HUADIAN ENG +2

Method and device for determining steady-stage voltage limit of half-wavelength power transmission line

The invention provides a method and device for determining a steady-stage voltage limit of a half-wavelength power transmission line. The method comprises the steps of building a half-wavelength power transmission line distribution parameter model; determining the distances from the positions respectively corresponding to a maximum value and a minimum value of the steady-state voltage on the half-wavelength power transmission line to the tail end of the half-wavelength power transmission line according to the half-wavelength power transmission line distribution parameter model; and determining the maximum value and the minimum value of the steady-state voltage according to the distance from the positions respectively corresponding to the maximum value and the minimum value of the steady-state voltage on the half-wavelength power transmission line to the tail end of the half-wavelength power transmission line. The method and device provided by the invention for determining the steady-state voltage limit of the half-wavelength power transmission line can be applied to theoretical and simulation analysis of a half-wavelength power transmission system and operation and control for an actual half-wavelength line, facilitate the system operation and analysis personnel to adopt effective control measures and improve the safe and stable operating level of an electric power system.
Owner:CHINA ELECTRIC POWER RES INST +3

Method for calculating power fluctuation peak value of alternating current tie line under impacts of direct current phase changing failure

The invention provides a method for calculating a power fluctuation peak value of an alternating current tie line under impacts of direct current phase changing failure. The method includes the steps of firstly, obtaining a direct current power curve within a direct current phase changing failure period, and calculating n-circuit direct current equivalent phase changing failure lasting time tau and natural oscillation frequency omega<n> and the damping ratio zeta of a large regional grid regional oscillation mode; secondly, building a power oscillation linearization second-order model of the alternating current tie line; thirdly, obtaining the power fluctuation peak value, the peak value power transfer ratio and the peak value time of the alternating current tie line. Compared with the prior art, the method for calculating the power fluctuation peak value of the alternating current tie line under the impacts of the direct current phase changing failure has the advantages that various parameters of the power fluctuation peak value of the alternating current tie line can be rapidly and accurately obtained, a technical person can easily determine the tie line operation power limit and a power grid operation mode, and take effective power control and protection measures, and the safe and stable operation level of a power system can be improved.
Owner:STATE GRID CORP OF CHINA +1

Method for discriminating voltage instability and load angle instability based on thevenin equivalent

The invention provides a method for judging power angle instability and voltage instability based on the dynamic Thevenin equivalence. When a power system fails and instable, and the voltage is greatly reduced, the system operation and analysts is difficult to judge whether the instable property of the system belongs to the power angle instability or the voltage instability. Based on the dynamic Thevenin equivalence method, the real-time variation of the Thevenin equivalent potential of a load node to be monitored after the failure occurs can be obtained; and compared with the Thevenin equivalent potential, the instable property of the system can be judged. The method can be applied to the on-line analysis control and the off-line emulation analysis of the power system, facilitate the system operation and the analysts to adopt the effective measure in time and improve the safe and stable operation level of the power system.
Owner:CHINA ELECTRIC POWER RES INST +1

Analysis experimental device and analysis experimental method for protection malfunction caused by direct current (DC) grounding cause

The invention discloses an analysis experimental device and an analysis experimental method for protection malfunction caused by direct current (DC) grounding. The analysis experimental device stimulates the circuit sate of a DC system in actual operation, provides experimental parameters such as insulation resistance, bridge resistance, grounding capacitance, cable capacitance and the like, and can be used for experimenting on faults of positive grounding, negative grounding and control loop grounding; concrete experimental contents and a concrete experimental method are provided; and a principle of protection malfunction caused by one-point grounding and related parameters thereof are fully realized for research and development, production, inspection, operation and maintenance and other links so as to take protection measures to prevent the generation of protection malfunction accidents caused by one-point grounding, thereby effectively improving the safe operation level of an electric system. The experimental method can be widely applied in relay protection research and production manufacturers, DC grounding detection equipment research and production manufacturers and operation accident analysis on the electric system.
Owner:广州仟顺电子设备有限公司 +2

Mathematical modeling method for steady-state random power fluctuation of alternating current connecting line

The invention provides a mathematical modeling method for steady-state random power fluctuation of an alternating current connecting line. Power grids are interconnected through the alternating current connecting line, and under the steady-state condition, long-cycle and irregular random power fluctuation on the connecting line is caused by load random fluctuation in the power grids at two ends. Based on a two-area alternating current connecting line power fluctuation model, according to the steady state operation and weak connecting line characteristics of large area power grids, a relation between the random power fluctuation and the power angle difference of equivalent generators is established, and a steady state random power fluctuation mathematical model of a two-area connecting line is obtained by solving a second-order differential equation of the power angle difference of the equivalent generators. The mathematical modeling method is applicable to theoretical and simulation analysis of a power system, the dynamic characteristic and connecting line random power fluctuation mechanism of two large-area interconnection power systems are mastered, the maximum amplitude of the steady-state random power fluctuation is computed, the system can conveniently operate, an analyst can timely take effective measures, and the safety and steady operation level of the power system is improved.
Owner:CHINA ELECTRIC POWER RES INST +1

Construction method and air conditioner control method for multi-load joint control strategy

The invention discloses a construction method and an air conditioner control method for a multi-load joint control strategy, and belongs to the technical field of multi-load joint control strategies. According to an existing control strategy, flexible loads cannot be effectively scheduled and accurately controlled. According to the construction method for a multi-scene multi-load joint control strategy provided by the invention, multi-load response potentials are evaluated, and a reasonable power utilization plan is made according to load characteristics and market response characteristics represented by an evaluation result; a multi-micro-load aggregation model in multiple scenes is further established, and multi-load active response and coordinated optimization are achieved; and the multi-micro-load aggregation model in multiple scenes is used as a part of a combined optimization model of multi-micro-load regional operation scheduling, and multi-scene multi-load joint control is realized. Therefore, hierarchical flexible optimization operation and efficient scheduling of user-side multi-micro-loads are realized, and the dynamic balance capability of a power grid is improved.
Owner:STATE GRID ZHEJIANG ELECTRIC POWER CO MARKETING SERVICE CENT +1

Large power system emulation analysis method based on direct-current external characteristic fitting

The invention belongs to the field of power systems, and particularly relates to a large power system emulation analysis method based on direct-current external characteristic fitting. According to the method, an equivalent small system is built in a direct-current near region to be researched and an electromagnetic transient model of the direct-current near region is set up; a direct-current power external characteristic curve of a fault to be researched is obtained through electromagnetic transient simulation, and fitting is carried out through a step curve; simulation is carried out in a plurality of shedding loads in a large power system, and simulation analysis is carried out under the same fault. The method can be used in theoretical research, simulation analysis and operation control of the power systems, enables the direct-current external characteristic curve provided by electromagnetic transient simulation to be organically combined with large power system transient simulation, can effectively carry out simulation analysis on the large power system containing a direct-current system, solves the problem that direct-current dynamic response characteristics are difficult to simulate accurately through a direct-current electromechanical transient model, facilitates system analysis, enables operators to master the operation characteristics of the large power system containing the direct-current system, and improves the power grid safe and stable operation level.
Owner:STATE GRID CORP OF CHINA +1

Ultrahigh-voltage direct-current transmission project converter transformer alternating-current loop system on-site inspection method

InactiveCN106324397ADesign comprehensive testingConstruction comprehensive inspectionTransformers testingSystems designTransformer
Disclosed is an ultrahigh-voltage direct-current (DC) transmission project converter transformer alternating-current (AC) loop system on-site inspection method. The method is implemented on a converter transformer after installation and commissioning test, and a converter valve is installed and is always in a locked state. An AC 500kV GIS is removed temporarily to a drainage line of the converter transformer, a test converter transformer T is connected, a test voltage is applied to the AC network side of the converter transformer through the converter transformer T, the valve-side windings of a Y / Y converter transformer and a Y / Delta converter transformer are grounded, and whether there is a loop defect from the primary wiring to the secondary loop of the converter transformer is judged by detecting the amplitudes and phases of the primary test current, primary test voltage, secondary current and secondary voltage. The design, construction and commissioning quality of a converter transformer AC loop system can be detected comprehensively, and the level of safe and stable operation of DC transmission can be improved.
Owner:云南送变电工程有限公司

Method for entering 500kV common-tower double-circuit vertically-arranged compact transmission line equipotential

The invention relates to a method for entering a 500kV common-tower double-circuit vertically-arranged compact transmission line equipotential. A tower comprises a tower head and a tower body. The tower head comprises a tower window and a cross arm arranged on the top of the tower window. A wire is arranged in the tower window. A live-working person climbs the tower, reaches the position with the height equal to that of the wire, moves to the bottom end of an insulator in the tower window from the edge of the tower window in parallel, and reaches the wire equipotential. By the adoption of the method for entering the 500kV common-tower double-circuit vertically-arranged compact transmission line equipotential, the live-working person has high safety in the process of 500kV common-tower double-circuit vertically-arranged compact transmission circuit live working.
Owner:STATE GRID CORP OF CHINA +1

A method and apparatus for determining a DC short-circuit ratio of a layered DC system access

ActiveCN109004690AImprove voltage support capabilitySolving Voltage Stability IssuesElectrical apparatusPower flowPower grid
The invention provides a method and a device for determining the DC short-circuit ratio of a layered DC system access. Firstly, an impedance matrix of an equivalent node of an AC system is establishedand the short-circuit capacity of a converter bus bar in the layered DC system is calculated. Finally, the DC short-circuit ratio of the converter bus is determined, which provides an important reference for the AC system planning. The invention is conducive to improving the voltage support capability of the layered DC system, guiding the important technical means of the power flow reasonable distribution of the power network, solving the voltage stability problem of the multi-feed DC system, promoting the coordinated development of the AC and DC power network, and has wide application prospect. The method and the device for judging the strength of the AC / DC system provided by the invention can be used for the planning and the operation of the layered DC transmission system, which is beneficial to the system planning, and the operators take effective control measures to improve the safe and stable operation level of the electric power system.
Owner:CHINA ELECTRIC POWER RES INST +1

Steady state voltage sensitivity determination method and apparatus for half-wavelength electric transmission line

The invention provides a steady state voltage sensitivity determination method and apparatus for a half-wavelength electric transmission line. Parameters of the half-wavelength electric transmission line are collected firstly; then a steady state voltage model of the half-wavelength electric transmission line is established according to the parameters of the half-wavelength electric transmission line; and finally, the voltage sensitivity is determined according to the steady state voltage model of the half-wavelength electric transmission line. According to the technical scheme provided by the invention, by virtue of the steady state voltage model of the half-wavelength electric transmission line, the steady state voltage sensitivity of the half-wavelength electric transmission line is calculated; a relation among the voltage of the half-wavelength line along the line, load active power, load reactive power and system frequency change can be reflected; and the determination method and apparatus can be used for theoretical and simulation analysis of the half-wavelength power transmission system, and operation and control of the actual half-wavelength line, system operation and effective control measures adopted by analyzers can be promoted, and safe and stable operation level of the power system can be improved.
Owner:CHINA ELECTRIC POWER RES INST +3

Method for improving high and low voltage ride-through capability of auxiliary engine frequency converter of thermal power generation unit

A method for improving the high-low voltage ride-through capability of a thermal power unit auxiliary frequency converter includes: a low-voltage ride-through method: when the voltage of a power supply line drops, a DC power supply is provided to an inverter in the frequency converter through a low-voltage ride-through capacitor. High-voltage ride-through method: When the AC voltage of the inverter's incoming line rises rapidly above the rated voltage level, the voltage is limited by means of energy-consuming chopping. Therefore, the technical problems existing in the prior art, such as frequent faults, expensive equipment, complex and cumbersome algorithms, and serious harm to the safe and stable operation of the power grid and the generator set, are solved. The method of the invention has simple control loop and rapid response, and improves the safe and stable operation level of thermal power plants and power grids.
Owner:LIAONING DONGKE ELECTRIC POWER

New energy penetration rate assessment method based on probability power flow calculation

The invention discloses a new energy penetration rate assessment method based on probability power flow calculation, and belongs to the technical field of power system automation. The method combines the impact on a power grid from the variability and instability of wind / solar hybrid generation and the external load level and the change condition thereof. The method takes static stable constraint and reactive power control of a power system as conditions, obtains the change range of the voltage of an output common grid-connected point of a wind / solar hybrid generation station through probability power flow calculation, takes the specified range of the voltage of the grid-connected point as the index, and carries out the assessment of the maximum capability that the wind / solar hybrid generation station is connected to the power grid. The method can improve the safe and stable operation level of the wind / solar hybrid generation station, effectively guarantees the generation of the wind / solar hybrid generation station, and improves the energy-saving and emission reduction benefits.
Owner:STATE GRID GASU ELECTRIC POWER RES INST +4

A stability control device operation information system and an online power grid risk assessment method thereof

The invention discloses a stability control device operation information system and an online power grid risk assessment method thereof. The system comprises a main controller, a data acquisition module, a centralized monitoring module, a real-time alarm module, an operation management module and an early warning decision module which are connected. The data acquisition module is used for acquiring actual measurement information of the stability control device, the centralized monitoring module is used for centralized monitoring of measured information of the stability control device, the real-time alarm module is at least used for event alarm of the stability control device and / or alarm of data inconsistency and / or insufficient control quantity, the operation management module is at leastused for constant value management and / or abnormal processing and / or action management of the stability control device, and the early warning decision module is used for current stability control strategy aided decision and / or online power grid risk assessment. According to the invention, an electric power safety accident level risk on-line assessment function possibly triggered by load sheddingdue to the action of the stability control device is realized, and a decision basis is provided for scheduling operation personnel to adjust the configuration of stability control system control elements and adjust the operation mode.
Owner:SHENZHEN POWER SUPPLY BUREAU

Wind farm power coordinative control method and system

The invention provides a wind farm power coordinative control method and system. The wind farm power coordinative control method is characterized in that the method includes steps: determining a reactive control work mode of a wind farm according to a power dispatching instruction; calculating a reactive loss of the wind farm; calculating a total reactive demand of the wind farm according to the reactive control work mode of the wind farm and the reactive loss of the wind farm; and distributing the total reactive demand of the wind farm according to a preset total reactive demand distributionrule of the wind farm, determining whether the total reactive demand of the wind farm exceeds a reactive output limit of a wind turbine generator system, bearing all the total reactive demand of the wind farm by the wind turbine generator system if not, and bearing the total reactive demand firstly by the wind turbine generator system and an excess portion by a reactive compensation device if yes.According to the technical method, the power grid friendliness of the wind farm is improved, the safe and stable operation level of the power grid of wind power massive centralized access regions isimproved, and the improvement of the wind power consumption capability of the power grid is promoted.
Owner:CHINA ELECTRIC POWER RES INST +1

Quick response method for accident information of power dispatching control center

The invention discloses a quick response method for accident information of a power dispatching control center, and the method comprises the steps: enabling all substations to be connected to an intelligent power grid dispatching control system, and obtaining the point table information of all substations; carrying out optimization rectification on an original remote signaling signal in the pointtable information so as to reduce the total amount of monitoring information accessed to the system; configuring a delay alarm function for the intelligent power grid dispatching control system so asto filter short-time'action and reset 'signals under each fault condition; and monitoring personnel accurately and quickly determine fault information from the rectified and filtered fault informationpush graph, and reporting a fault tripping conclusion to a dispatcher in time after preliminary analysis and research and judgment. According to the quick response method for the accident informationof the power dispatching control center, the pressure of fault research and judgment under the accident condition of an on-duty monitor is greatly reduced, and the accident information processing time is shortened; and meanwhile, the pressure of monitoring personnel is reduced through monitoring information optimization, the monitoring efficiency is improved, and the safe and stable operation level of a power grid is improved.
Owner:XIANNING POWER SUPPLY COMPANY OF STATE GRID HUBEIELECTRIC POWER

Method and system for avoiding same-tower multi-loop vertical connection zero sequence direction protection maloperation

The present invention provides a method and a system for avoiding same-tower multi-loop vertical connection zero sequence direction protection maloperation. The method and the system are based on station domain information, it is determined whether there is a loop with faults or not through determination of whether a first criterion is established, it is determined whether loops except the fault loops in the multiple loops with voltage levels having faults have zero sequence voltage zero-crossing points or not according to a second criterion, and when loops except the fault loops in the multiple loops with voltage levels having faults have zero sequence voltage zero-crossing points, the reverse compensation is performed; it is determined whether loops with voltage levels without faults have zero sequence voltage zero-crossing points or not according to a third criterion in a same-tower mixed voltage multiple loops, and if yes, the vertical connection zero sequence protection is closed.The method and the system completely solve the problems of the same-voltage and mixed voltage multi-loop vertical connection zero sequence direction protection maloperation of the same tower caused by open-phase operation or break line faults and ensure the precision of the vertical connection zero sequence direction protection so as to improve the electric system maloperation capacity and the power grid safe and stable operation level.
Owner:CHINA ELECTRIC POWER RES INST +1
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products