A technology of intelligent monitoring and early warning system, which is applied in infrastructure testing, infrastructure engineering, construction, etc., can solve problems such as lack of media, and achieve the effect of shortening delays

Inactive Publication Date: 2017-02-01
SHANGHAI URBAN CONSTRUCTION MUNICIPAL ENGINEERING (GROUP) CO LTD +1
View PDF6 Cites 30 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

The traditional foundation pit monitoring data is separated from the site, the data is stored in the remote database, and the early warning information is connected and mapped with the site. The two lack media, and the mapping must be completed manually.
Therefore, it is impossible for people to call and view data and obtain information in real time on the spot

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Foundation pit intelligent monitoring and active forewarning method and system based on building information modeling (BIM)
  • Foundation pit intelligent monitoring and active forewarning method and system based on building information modeling (BIM)
  • Foundation pit intelligent monitoring and active forewarning method and system based on building information modeling (BIM)

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0041] The present invention will be described in detail below in conjunction with specific embodiments. The following examples will help those skilled in the art to further understand the present invention, but do not limit the present invention in any form. It should be noted that those skilled in the art can make several changes and improvements without departing from the concept of the present invention. These all belong to the protection scope of the present invention.

[0042] A BIM-based foundation pit intelligent monitoring and active early warning method provided according to the present invention comprises the following steps:

[0043] Data collection step: collect real-time data of foundation pit;

[0044] Early warning analysis step: use the foundation pit BIM model to analyze the real-time data of the foundation pit to obtain early warning information;

[0045] Early warning release steps: release early warning information through the BIM model of the foundatio...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention provides a foundation pit intelligent monitoring and active forewarning method and system based on building information modeling (BIM). The method includes a data acquisition step, specifically, foundation pit real-time data are acquired; a forewarning analysis step, specifically, a foundation pit BIM model is used for analyzing the foundation pit real-time data, and forewarning information is obtained; and a forewarning issuing step, specifically, the forewarning information is issued through the foundation pit BIM model. Acquired onsite measuring point data are associated with the foundation pit BIM model through a predetermined numbering rule in a one-to-one correspondence mode, namely the BIM model serves as a database of monitoring data, the BIM model is used as a medium to achieve the mapping relation between data and sites, forewarning information is displayed through the foundation pit BIM model, data processing such as real-time acquisition, gathering and displaying of on-site measuring data is achieved, and the delay between the on-site dynamic state and the mastering dynamic state is greatly shortened.

Description

technical field [0001] The invention relates to BIM technology, in particular to a BIM-based foundation pit intelligent monitoring and active early warning method and system. Background technique [0002] BIM is the abbreviation of Building Information Modeling, which is usually translated into building information model in China. It is an information management technology for the whole life cycle of a building, which has five characteristics of visualization, coordination, simulation, optimization and drawing. BIM is a brand-new method of architectural design, construction, and management. Based on three-dimensional digital information technology, all data in planning, design, construction, and operation stages are included in the 3D model, allowing the entire life cycle of the building to When using the model, workers at any stage in the process can make effective and correct decisions based on accurate and complete data. [0003] During the excavation of the foundation ...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
IPC IPC(8): E02D33/00
CPCE02D33/00
Inventor 尹仕友
Owner SHANGHAI URBAN CONSTRUCTION MUNICIPAL ENGINEERING (GROUP) CO LTD
Features
  • R&D
  • Intellectual Property
  • Life Sciences
  • Materials
  • Tech Scout
Why Patsnap Eureka
  • Unparalleled Data Quality
  • Higher Quality Content
  • 60% Fewer Hallucinations
Social media
Patsnap Eureka Blog
Learn More