Concrete Lining Sliding Form and Construction Method for Tunnel Inverted Arch
A construction method and concrete technology, which are applied to tunnel lining, wellbore lining, earthwork drilling, etc., can solve the problems of difficulty in increasing construction speed, increase construction cost, and high manufacturing cost of inverted arch trolleys, and reduce construction constraints, The effect of improving construction speed and reducing construction cost
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0026] The present invention will be further described in detail below with reference to the drawings and examples, but the present invention is not limited to the following embodiments.
[0027] exist figure 1 , 2 Among them, the tunnel invert concrete lining sliding form in this embodiment is composed of a left supplementary hopper 2, a guard plate 1, a reinforcing rib 3, a hoist 4, a sliding formwork 5, a right supplementary hopper 6, and a plate vibrator 7. For further understanding, define the forward direction of the sliding model as the front side.
[0028] A guard plate 1 perpendicular to the slide formwork 5 is arranged around the slide formwork 5, the slide formwork 5 and the guard plate 1 are connected as a whole, and criss-cross reinforcement ribs 3 are welded on the slide formwork formwork 5, and the reinforcement ribs 3 prevent sliding The mold template 5 is deformed, and the geometric shape of the sliding formwork 5 is the same as that of the tunnel invert. Th...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 