Unlock instant, AI-driven research and patent intelligence for your innovation.

Concrete Lining Sliding Form and Construction Method for Tunnel Inverted Arch

A construction method and concrete technology, which are applied to tunnel lining, wellbore lining, earthwork drilling, etc., can solve the problems of difficulty in increasing construction speed, increase construction cost, and high manufacturing cost of inverted arch trolleys, and reduce construction constraints, The effect of improving construction speed and reducing construction cost

Active Publication Date: 2019-03-08
SINOHYDRO ENG BUREAU 15
View PDF7 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

For the construction method of "arch the wall first and then the inverted arch", nowadays, the conventional inverted arch concrete lining of the tunnel is constructed by the inverted arch trolley. Considering the construction plan, the traditional inverted arch steel formwork trolley is restricted by the demoulding time , the construction speed is not easy to increase, and the production cost of the inverted arch trolley is high, which increases the construction cost

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Concrete Lining Sliding Form and Construction Method for Tunnel Inverted Arch
  • Concrete Lining Sliding Form and Construction Method for Tunnel Inverted Arch
  • Concrete Lining Sliding Form and Construction Method for Tunnel Inverted Arch

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0026] The present invention will be further described in detail below with reference to the drawings and examples, but the present invention is not limited to the following embodiments.

[0027] exist figure 1 , 2 Among them, the tunnel invert concrete lining sliding form in this embodiment is composed of a left supplementary hopper 2, a guard plate 1, a reinforcing rib 3, a hoist 4, a sliding formwork 5, a right supplementary hopper 6, and a plate vibrator 7. For further understanding, define the forward direction of the sliding model as the front side.

[0028] A guard plate 1 perpendicular to the slide formwork 5 is arranged around the slide formwork 5, the slide formwork 5 and the guard plate 1 are connected as a whole, and criss-cross reinforcement ribs 3 are welded on the slide formwork formwork 5, and the reinforcement ribs 3 prevent sliding The mold template 5 is deformed, and the geometric shape of the sliding formwork 5 is the same as that of the tunnel invert. Th...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention provides a tunnel inverted arch concrete lining slip form and a construction method. Guard boards perpendicular to a formwork of the slip form are arranged on the periphery of the formwork of the slip form and connected with the formwork of the slip form into a whole. Reinforcing ribs are arranged on the formwork of the slip form. The geometrical shape of the formwork of the slip form is the same as the shape of a tunnel inverted arch. A left material supplementation hopper is arranged on the left side of the formwork of the slip form in a penetrating mode, and a right material supplementation hopper is arranged on the right side of the formwork of the slip form in a penetrating mode. The formwork of the slip form is provided with a winch and a flat plate vibrator. The construction method of the tunnel inverted arch concrete lining slip form comprises the steps of leveling treatment of a slip form slide rail part, slip form positioning, connection of a slip form slide power device, concrete pouring and manual precise leveling of a concrete surface.

Description

technical field [0001] The invention belongs to the technical field of tunnel lining, and in particular relates to a tunnel inverted arch concrete lining sliding form and a construction method. Background technique [0002] In recent years, with the continuous advancement of my country's scientific and technological strength, the continuous innovation of construction equipment in the construction industry, and the continuous improvement of technological levels, the water diversion tunnels in water conservancy and hydropower projects have gradually developed in the direction of super long and super large diameters. There are two types: "arch the wall first and then arch the wall" and "arch the wall first and then arch the wall". For the construction method of "arch the wall first and then the inverted arch", nowadays, the conventional inverted arch concrete lining of the tunnel is constructed by the inverted arch trolley. Considering the construction plan, the traditional inve...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Patents(China)
IPC IPC(8): E21D11/10
CPCE21D11/10E21D11/102
Inventor 党晓青商晓辉许选耀祁洪仓王朋飞华永超
Owner SINOHYDRO ENG BUREAU 15