Dynamic planning improvement algorithm for power generation dispatching of cascade reservoir group
A cascaded reservoir and dynamic programming technology, applied in computing, electrical digital data processing, instruments, etc., to achieve the effect of less time for solving
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0027] In order to make the object, technical solution and advantages of the present invention clearer, the present invention will be further described in detail below in conjunction with the accompanying drawings. It should be understood that the specific embodiments described here are only used to explain the present invention, and are not intended to limit the present invention.
[0028] The technical scheme of the present invention will be further described below through an example of optimization of power generation scheduling of cascade reservoirs in the Han River Basin and in conjunction with the accompanying drawings.
[0029] figure 1 It is the flow chart of this embodiment, and the specific steps are as follows:
[0030] Step 1, perform post-order traversal on the cascade reservoir group to obtain the optimized sequence;
[0031] figure 2 Indicates the relative upstream and downstream relationship of the reservoirs in the Han River Basin. It is easy to know that ...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More - R&D
- Intellectual Property
- Life Sciences
- Materials
- Tech Scout
- Unparalleled Data Quality
- Higher Quality Content
- 60% Fewer Hallucinations
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2025 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com



